Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 3 blank: general contractor, area (sq ft), construction type. | Type them on Step 1. |
| Electrical drawings | pass | 4 sheets, all legible. | |
| Panel schedules | blocker | None found. | Ask the GC for the panel schedules before pricing gear or feeders. |
| Single-line / riser | not included | Not included in the set. | Ask for the one-line if the job touches service, feeders or gear. |
| Lighting information | pass | 1 fixture line. | |
| Equipment schedules | warning | No equipment connections read. | Ask for the mechanical, plumbing and kitchen equipment schedules. |
| Specifications | warning | None received. | Ask for Division 26, or state the assumed methods on the proposal. |
| Utility / civil | not checked | No site sheet — fine if interior only. | Confirm whether the job includes site or utility scope. |
| Existing conditions | not checked | No demolition read; construction type not set. | Set the construction type on Step 1. |
| Addenda / revisions | not checked | Base set only. | Check the bid portal for the latest revision before submitting. |
| Architectural drawings | not checked | None identified. | Open the set and confirm the architectural sheets are present. |
| Responsibility matrix / GC scope | not checked | None found in the set. | Ask for the GC scope letter / responsibility matrix, or RFI it. |