Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 1 blank: general contractor. | Type them on Step 1. |
| Electrical drawings | pass | 9 sheets, all legible. | |
| Panel schedules | pass | On E-601, E-900. | |
| Single-line / riser | pass | On E-600. | |
| Lighting information | warning | No fixture schedule or lighting plan. | Ask for the fixture schedule and the lighting control information. |
| Equipment schedules | warning | No equipment connections read. | Ask for the mechanical, plumbing and kitchen equipment schedules. |
| Specifications | warning | None received. | Ask for Division 26, or state the assumed methods on the proposal. |
| Utility / civil | not checked | No site sheet — fine if interior only. | Confirm whether the job includes site or utility scope. |
| Existing conditions | warning | No demolition read on a TI job. | Ask for the existing-conditions / demolition drawings. |
| Addenda / revisions | pass | 4 revisions merged. | |
| Architectural drawings | not checked | None identified. | Open the set and confirm the architectural sheets are present. |
| Responsibility matrix / GC scope | not checked | None found in the set. | Ask for the GC scope letter / responsibility matrix, or RFI it. |