A quick set of criteria for the RRE team to check whether they want to bid this job or not. They come from sections 1 and 2 of the RRE Bid Intake Guideline →, which is the place to go when one of them is a judgement call.
Responsibility matrix: not checked — this set was read before the check existed, or its non-electrical sheets have no readable text. Look for an owner / tenant / contractor matrix on the architectural cover or general sheets before deciding.
Source: rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf (bid invitation).
Nothing answered yet. Answers save as you go; a name is needed only to record the decision.
| Criterion | Verdict | What it rests on |
|---|---|---|
| Union Project? | unknown | Nobody has said whether this is a union job. |
| Government or Public Works job? | unknown | Nobody has said whether this is public work. |
| Inside a Served Zone? | green | Inside a zone RRE works in. |
| Prevailing Wage job? | green | Not prevailing wage. |
| Fresno area over 5,000 sq ft? | green | Not a large Fresno-area job, so the capacity limit does not apply. |
| Work Type | green | Tenant improvement — the normal focus. |
| Night or off-hours work? | unknown | Night or off-hours requirements are not known yet. |
| Bid period adequate? | consider | Short turnaround for this scope. A short period is acceptable on a simple job and a real risk on a complex one. |
| Rough Order of Magnitude Job Value | green | Not estimated yet. Information only: RRE bids from about $5,000 to $2 million, and the value never decides the recommendation. |
| Preferred Client | unknown | Required: say whether this GC is a preferred client before recording a decision. |
| Job Type | unknown | The job type has not been classified, and it decides whether this is work RRE actively looks for, work it avoids, or something unfamiliar. |
Same project, other GCs: mango-corte-10; Mango-Corte-14; Schasche (bid).