Loading…
Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 4 blank: project address, general contractor, area (sq ft), construction type. | Type them on Step 1. |
| Electrical drawings | pass | 8 sheets, all legible. | |
| Panel schedules | pass | On E600. | |
| Single-line / riser | not included | Not included in the set. | Ask for the one-line if the job touches service, feeders or gear. |
| Lighting information | pass | 21 fixture lines. | |
| Equipment schedules | pass | 1 equipment connection. | |
| Specifications | pass | On a drawing sheet. | |
| Utility / civil | pass | On E115. | |
| Existing conditions | not checked | No demolition read; construction type not set. | Set the construction type on Step 1. |
| Addenda / revisions | pass | 1 revision merged. | |
| Architectural drawings | not checked | None identified. | Open the set and confirm the architectural sheets are present. |
| Responsibility matrix / GC scope | not checked | None found in the set. | Ask for the GC scope letter / responsibility matrix, or RFI it. |