Loading…
What was received, analyzed.
0 of 6 were stated in the documents and read off them. 4 are blank because no document says — type them here and they carry into Step 2, the readiness gate and the proposal.
no bid invitation None of the documents is a bid invitation, so these were read from the drawings alone. Type the rest from the GC’s email, or add the invitation to the job and read them again.
| Drawing or construction set | found | 63 pages · 8 electrical sheet(s). |
| Symbol list on the drawings | partial | No legend found — symbols named from NECA 100-2006. |
| Bid invitation or RFP | not found | Not uploaded — the bid / no-bid questions are answered by hand. |
| File | Type | Pages | Received | |
|---|---|---|---|---|
| 04-4532-construction-set-2026-02-02.pdf | Drawing set | 59 | 9/22/2026 | Open → |
| 04-4532-field-revisions-rev10-2026-04-24.pdf | Addendum | 4 | 9/22/2026 | Open → |
Not checked. Either this set was read before the sheet check existed (any job uploaded before 2026-09-25 19:15 UTC), or its non-electrical sheets have no readable text. Either way the takeoff chooses them itself; its coverage notes say which it read.
| Engineering firm | EVERJ ENGINEERING, INC |
| Sheets read | 8 read · 8 with marks on the drawing E010, E100, E110, E115, E600, E700, E705, E710 |