| # | Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|---|
| 1 | E100 page 47 | ELECTRICAL LIGHTING PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 2 | E110 page 48 | ELECTRICAL POWER PLAN | 4 open questions on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 3 | E115 page 49 | ELECTRICAL SITE POWER PLAN | 2 open questions on the drawing. | open | Open → |
| 4 | E600 page 3 | ELECTRICAL SCHEDULES scale not set | 7 open questions on the drawing. 3 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again. 04-4532-construction-set-2026-02-02.pdf carries 63 pages and 8 are listed here — the remaining 55 have not been classified, so nothing on this screen speaks for them.
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
FIXTURE A1 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE B1 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE B2 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE B3 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE C0 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE C2 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE C3 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
Symbols on this set. No symbol library was found on the drawings, and EVERJ ENGINEERING, INC has no conventions file in the knowledge base. This set is read against the default library alone: NECA 100-2006. It is the firm's baseline for what a symbol MEANS where a legend is silent, ambiguous or absent, and it is also the checklist of which symbol categories a plan of this kind ought to show. A line named from the baseline rather than from a legend is named by convention, not by the set. It is reported as 'named from NECA 100, confirm' and carries a semantic-risk flag — a misread convention is a 3× error that no percentage band expresses.
None yet.
None.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
E010 page 46 | ELECTRICAL SPECIFICATIONS scale not set | Details, elevations and specifications were indexed and classified but not read for scope. Not a plan or schedule sheet. | nothing open | Read it → |
E700 page 51 | ELECTRICAL INTERIOR ELEVATIONS | Details, elevations and specifications were indexed and classified but not read for scope. Not a plan or schedule sheet. | nothing open | Read it → |
E705 page 52 | ELECTRICAL INTERIOR ELEVATIONS | Details, elevations and specifications were indexed and classified but not read for scope. Not a plan or schedule sheet. | nothing open | Read it → |
E710 page 4 | ELECTRICAL DETAILS scale not set | Details, elevations and specifications were indexed and classified but not read for scope. Not a plan or schedule sheet. | nothing open | Read it → |
FIXTURE E1 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE E2 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE E4 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE E7 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE H1 The drawings say “furnished by hs/tls”. | HS/TLS | HS | Not RRE’s: furnished and installed by others | E100 |
FIXTURE J4 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE P5 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE P6 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE S1 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE T-6 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE T-8 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE T1 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE TCL-2 The drawings say “furnished by tls”. | TLS | GC | RRE installs / connects only | E100 |
FIXTURE W1 The drawings say “furnished by wcs”. | WCS | GC | RRE installs / connects only | E100 |