Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 1 blank: general contractor. | Type them on Step 1. |
| Electrical drawings | pass | 78 sheets, all legible. | |
| Panel schedules | pass | On A-500, E-601, E-900. | |
| Single-line / riser | pass | On E-600. | |
| Lighting information | pass | 51 fixture lines. | |
| Equipment schedules | pass | 28 equipment connections. | |
| Specifications | pass | On a drawing sheet. | |
| Utility / civil | not checked | No site sheet — fine if interior only. | Confirm whether the job includes site or utility scope. |
| Existing conditions | pass | Demolition shown. | |
| Addenda / revisions | not checked | Base set only. | Check the bid portal for the latest revision before submitting. |
| Architectural drawings | pass | 26 A sheets read for electrical scope: A-001, A-002, A-003, A-005, A-006, A-007…. | |
| Responsibility matrix / GC scope | pass | On A-090, Revision 1 - Notes _ changes p.2. |