| # | Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|---|
| 1 | 2498 A set p38 page 38 | A-480 Millwork M-7: Repisa & M-12: Oak Wall Panel Details scale not set | 2 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 2 | A-092 page 17 | Photometrics scale not set | 2 open questions on the drawing. | open | Open → |
| 3 | A-110 page 18 | Demolition Floor Plan / Demolition Notes | 2 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 4 | A-130 page 21 | Reflected Ceiling & Lighting Plan | 5 open questions on the drawing. 5 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 5 | A-200 page 24 | Exterior Storefront Plan, Elevation & Details | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 6 | A-210 page 26 | Storefront Section Details scale not set | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 7 | A-300 page 27 | Interior Sections & Elevations | 3 open questions on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 8 | A-400 page 30 | Millwork M-1: Cash Counter Plans & Details | 1 open question on the drawing. | open | Open → |
| 9 | A-410 page 31 | Millwork Detail @ M-2c Back Of Cash Counter scale not set | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 10 | A-500 page 39 | Door Schedule, Type & Details scale not set | 10 open questions on the drawing. 10 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 11 | E-601 page 6 | PANEL SCHEDULE scale not set | 2 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 12 | F-15 page 34 | MILLWORK M-4: FITTING ROOM TABLE / M-5: MIRROR W/LED (title block sheet no. A-430, Cortland Morgan Architect A-set) scale not set | 3 open questions on the drawing. | open | Open → |
| 13 | A-425 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 33 | Millwork M3: Fitting Room Walls Details, ADA Bench | Picked to read, but the takeoff did not read it: open the page and say what it adds, or re-run. | open | Open → |
| 14 | E-400 page 4 | PLAN scale not set | Picked to read, but the takeoff did not read it: open the page and say what it adds, or re-run. | open | Open → |
Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again.
Wired as: Homeruns in 3/4" EMT with #10; fixtures in MC luminary cable; device drops in MC — set by kelchlin.
The RRE item carries no price for the part named, so the estimate has the install labor and rough-in only, and the vendor or sub prices the rest. Send the lighting and gear lists from Material list & vendor quotes.
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
TRACK FIXTURE TYPE P08.1w (schedule Track) Track head, modular/track fixture, current-limited (fed via Panel CL, Tracks 1/3/5/7) | LED TRACK SPOT FIXTURE | 95 ea | E-300 |
TRACK FIXTURE TYPE P15.1w (schedule Track) Track head, modular/track fixture (Tracks 2/4/6) | LED TRACK SPOT FIXTURE | 115 ea | E-300 |
LIGHT FIXTURE TYPE EX01 (schedule EX01) Exit sign, 120V LED, 90-min battery back-up, unswitched (circuit 41) | LED GRN EXIT FIXTURE | 6 ea | E-300 |
LIGHT FIXTURE TYPE BA (schedule BA) -- EM emergency battery-pack option Suspended 4' light fixture (Table F 'BA') shown on the photometric plan with an 'EM' battery-pack designator per Lighting Note 6 -- EC wiring/connection of the integral battery pack, not a separate fixture body | LED EMERGENCYLIGHT DUAL | 3 ea | A-092 |
LIGHT FIXTURE TYPE QA (schedule: not found) -- EM emergency battery-pack option Fixture family 'QA' with an 'EM' battery-pack designator -- no Table F schedule row exists for 'QA' anywhere in this run's read set |
Symbols on this set. A symbol list was found on the drawings: E-200 — SYMBOLS LIST. The project legend is authoritative for this set and outranks everything else — NECA 100-2006 itself allows a drawing to use non-standard symbols provided the legend explains them. NECA 100-2006 stays underneath it for anything the legend leaves silent, and no conventions file exists for the engineering firm.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
2498 A set p1 page 1 | A-001 Cover Page (General/House/Mall Notes, Index of Drawings, Code Index, Legend, Key Plan, Lease Plan, Vicinity Map) scale not set | Read. | ✓ confirmed by kelchlin · Sep 26, 11:41 PM | Open to reopen or edit → |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
2498 A set p2 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 2 | A-002 GENERAL NOTES | Read for scope: nothing electrical on it. | nothing open | See the page → |
2498 A set p3 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 3 | A-003 ACCESSIBILITY NOTES | Read for scope: nothing electrical on it. | nothing open | See the page → |
2498 A set p35 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 35 | A-441 Millwork M-7: Repisa & MC-5 Wall Details | Read for scope: nothing electrical on it. | nothing open | See the page → |
2498 A set p5 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 5 | A-005 Wall Type Schedule & Floor Details | Read for scope: nothing electrical on it. | nothing open | See the page → |
2498 A set p6 page 6 | A-006 Ceiling, Lighting and General Details scale not set | Read. | nothing open |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
2498 A set p10 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 10 | Accessibility Notes and Details (For Reference) 2 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 10): ADA code text and door/ramp clearance diagrams, no electrical content. | not read | Open the page → |
2498 A set p11 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 11 | Accessibility Notes and Details (For Reference) 3 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 11): ADA parking/curb ramp code text and diagrams, no electrical content. | not read | Open the page → |
2498 A set p12 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 12 | Existing Master Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 12): Site plan showing existing parking, anchor stores and accessible paths; no electrical scope. | not read | Open the page → |
2498 A set p13 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 13 | Enlarged Common Area Restroom Plans and Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 13): Restroom fixture clearance/ADA details (grab bars, urinals, drinking fountain); plumbing/architectural only. |
| LED EMERGENCYLIGHT DUAL |
| 1 ea |
| A-092 |
EMERGENCY LIGHT TAG EM2 (remote head or battery-pack option, unresolved) Standalone 'EM2' red text tag at a fixture/device position with no fixture-family prefix | LED EMERGENCYLIGHT DUAL | 11 ea | A-092 |
EMERGENCY LIGHT TAG EM3 (remote head or battery-pack option, unresolved) Standalone 'EM3' red text tag at a fixture/device position with no fixture-family prefix | LED EMERGENCYLIGHT DUAL | 5 ea | A-092 |
EMERGENCY LIGHT TAG EM5 (remote head or battery-pack option, unresolved) Standalone 'EM5' red text tag at a fixture/device position with no fixture-family prefix | LED EMERGENCYLIGHT DUAL | 14 ea | A-092 |
LIGHT FIXTURE TYPE BA/EM (schedule BA) Suspended 4' light fixture, emergency-circuit tagged variant | LED EMERGENCYLIGHT DUAL | 3 ea | A-130 |
LIGHT FIXTURE TYPE EXIT SIGN (schedule EX01 or EX02, tag not printed on A-300) Wall-mounted illuminated EXIT sign fixture, shown pictorially above the corridor/back-of-house door head in Interior Section/Elevation 6; EC furnish-connect per house standard off the emergency lighting circuit | LED GRN EXIT FIXTURE | 1 ea | A-300 |
EXIT SIGN FIXTURE - WALL-MOUNT STANDOFF BRACKET SUPPORT Wall-mounted illuminated exit sign fixture shown in interior elevation, mounted high on wall via a two-point standoff bracket/arm (not flush or ceiling-mounted); support hardware for one exit-sign location. Fixture itself is already carried in the E-800 fixture schedule count of 7 (EX01 x6 + EX02 x1) - this line covers the mounting bracket/support only, so it must not be added to the E-800 fixture unit count. | LED GRN EXIT FIXTURE | 1 ea | A-310 |
LIGHT FIXTURE TYPE EXIT (schedule EX01 or EX02) Illuminated wall/ceiling-mounted EXIT sign fixture shown above the corridor door in the Hall Elevation, view 7, sheet A-320. No fixture tag is printed beside the icon on this sheet; job-facts.md's E-800 Title-24 fixture schedule carries two exit-sign types (EX01, 6 units, 28W and EX02, 1 unit, 28W) that this unit is one of. Emergency/unswitched circuiting per job-facts (Panel A ckt41, lock-on breaker) is recorded elsewhere from E-601 by another sheet agent -- this line is the device count only. | LED GRN EXIT FIXTURE | 1 ea | A-320 |
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
LED DRIVER / REMOTE TRANSFORMER FOR LIGHT FIXTURE TYPE MI-1 Remote LED transformer serving the mirror LED strip (L-0002), installed concealed in an accessible cabinet or closet per spec 26-50.22; a cavity for the transformer is shown behind/below the mirror at the fitting-room table detail with a leader labeled 'LINE OF CAVITY FOR TRANSFORMER' and 'TO LED TRANSFORMER'. Note requires the transformer be accessible and well-vented, with a taped-in access panel if built into an adjacent wall/column/ceiling enclosure. | the gear itself (no RRE item picked yet) | 1 ea | A-500 |
TRANSFORMER, CONCEALED IN ACCESS PANEL (DIV 26 KEYED NOTE 26-50.23) Signage/lighting step-down transformer, concealed behind a taped-in ceiling/wall access panel, at each of the two storefront window section details (existing bay and display-platform bay) | the gear itself (no RRE item picked yet) | 2 ea | A-210 |
LED REMOTE TRANSFORMER (millwork cabinet, back-of-cash-counter, note 26-50.23) LED remote transformer/driver installed concealed inside the back-cash-counter millwork cabinet per keyed note 26-50.23: accessible and well vented; if installed in an adjacent wall/column enclosure or ceiling, a taped-in access panel is required. Detail item 5 ('Detail @ M-2A Millwork', 3"=1'-0") shows one transformer symbol near the top of the cabinet interior alongside a 'Provide 2" Diameter Opening' callout in the millwork top, read as the cable pass-through for the driver's low-voltage output leg. | the gear itself (no RRE item picked yet) | 1 ea | A-410 |
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
LUTRON VIVE CENTRAL HUB The drawings say “vendor-supplied”. | Vendor | not stated | RRE installs / connects only | E-300 |
LIGHT FIXTURE TYPE 26-50.21 LED STRIP (base run, Oak Wall Panel/Repisa) The drawings say “owner-furnished”. | Owner | not stated | RRE installs / connects only | 000-Copy-of-2498-A-set-2025-0530-Revision-1-p38 |
LIGHT FIXTURE TYPE 26-50.21 LED STRIP (conditional upper run, ceiling >13'-0") The drawings say “owner-furnished”. | Owner | not stated | RRE installs / connects only | 000-Copy-of-2498-A-set-2025-0530-Revision-1-p38 |
LED DRIVER/TRANSFORMER POWER CONNECTION & ACCESS COORDINATION The drawings say “owner-furnished”. | Owner | not stated | RRE installs / connects only | 000-Copy-of-2498-A-set-2025-0530-Revision-1-p38 |
POWER CONNECTION - ILLUMINATED SIGN (ENTRANCE) The drawings say “owner-furnished”. | Owner | not stated | RRE installs / connects only | A-500 |
SIGNAGE - ILLUMINATED BLADE SIGN (GC FURNISH & INSTALL) The drawings say “owner-furnished”. | Owner | not stated | RRE installs / connects only | A-500 |
DEMOLITION OF EXISTING ELECTRICAL POWER & DATA TO MAIN PANEL Struck by Firm policy: RRE does not bid demolition: Demolition by others: RRE does not bid demolition. | — | not stated | Struck: not in this bid | A-110 |
DEMOLITION OF EXISTING LIGHTING & BRANCH WIRING Struck by Firm policy: RRE does not bid demolition: Demolition by others: RRE does not bid demolition. | — | not stated | Struck: not in this bid | A-110 |
REMOVAL OF ELECTRICAL OUTLETS/CONDUIT IN DEMOLISHED PARTITION Struck by Firm policy: RRE does not bid demolition: Demolition by others: RRE does not bid demolition. | — | not stated | Struck: not in this bid | A-110 |
LOW VOLTAGE / LINE VOLTAGE SLAB CORE DRILL COORDINATION The drawings say “by gc”. | GC | not stated | RRE installs / connects only | A-110 |
DEMO - EXISTING CEILING LIGHT FIXTURES (REMOVE, TYPE UNSPECIFIED) Struck by Firm policy: RRE does not bid demolition: Demolition by others: RRE does not bid demolition. | — | not stated | Struck: not in this bid | A-111 |
CONDUIT TO CASH-COUNTER RECESSED OUTLET The drawings say “by others”. | Others | Others | Not RRE’s: furnished and installed by others | A-400 |
POWER & LOW VOLTAGE - ACCESS CONTROL KEYPAD (DOOR #05, RETAIL TO STORAGE, SALES SIDE) The drawings say “vendor-furnished”. | Vendor | not stated | RRE installs / connects only | A-500 |
POWER & LOW VOLTAGE - ACCESS CONTROL KEYPAD (DOOR #06, BOH HALLWAY TO STORAGE, EXTERIOR-FACE CONTROL) The drawings say “vendor-furnished”. | Vendor | not stated | RRE installs / connects only | A-500 |
POWER & LOW VOLTAGE - ACCESS CONTROL KEYPAD (DOOR #07, BOH HALLWAY TO OFFICE, EXTERIOR-FACE CONTROL, KEYLESS RELEASE INTERIOR) The drawings say “vendor-furnished”. | Vendor | not stated | RRE installs / connects only | A-500 |
POWER & LOW VOLTAGE - ELECTRIC PANIC HARDWARE WITH KEYPAD (DOOR EX-01, MALL CORRIDOR EGRESS DOOR) The drawings say “vendor-furnished”. | Vendor | not stated | RRE installs / connects only | A-500 |
| Read it → |
2498 Revision 1 Notes p2 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 2 | domoarchitecture Transmittal – Revision 1 Notes & Changes (sheet-by-sheet log, covering A-009 thru A-014, A-090 thru A-092, A-110) | Read for scope: nothing electrical on it. | nothing open | See the page → |
A-007 page 7 | Storage Shelving System & M-14 Charging Station Details scale not set | Read. | nothing open | Read it → |
A-090 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 15 | SCHEDULES AND RESPONSIBILITY MATRIX | Read for scope: 24 lines taken off. | nothing open | See the page → |
A-111 page 19 | Demolition Reflected Ceiling Plan | Read. | nothing open | Read it → |
A-120 page 20 | Construction, Power & Data Floor Plan | Read. | nothing open | Read it → |
A-150 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 23 | Low Voltage & Signage Plan | Read for scope: 5 lines taken off. | nothing open | See the page → |
A-201 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 25 | Interior Storefront Plan, Elevation & Details | Read for scope: nothing electrical on it. | nothing open | See the page → |
A-310 page 28 | Interior Sections & Elevations scale not set | Read. | nothing open | Read it → |
A-320 page 29 | Interior Sections/Elevations and Partial Plan (BOH) | Read. | nothing open | Read it → |
E-100 page 1 | ELECTRICAL SPECIFICATIONS scale not set | Read. | nothing open | Read it → |
E-200 page 2 symbol list | GENERAL NOTES, ABBREVIATIONS & SYMBOLS LIST scale not set | Read. | nothing open | Read it → |
E-300 page 3 | LIGHTING PLAN | Read. | nothing open | Read it → |
E-600 page 5 | ELECTRICAL RISER DIAGRAM scale not set | Read. | nothing open | Read it → |
E-800 page 7 | ENERGY ANALYSIS LIGHTING COMPLIANCE (NRCC-LTI-E pp.1-6) scale not set | Read. | nothing open | Read it → |
E-801 page 8 | ENERGY ANALYSIS LIGHTING COMPLIANCE (NRCC-LTI-E pp.7-11) scale not set | Read. | nothing open | Read it → |
E-900 page 9 | LIGHTING CONTROL SCHEDULE (Lutron Vive system details) scale not set | Read. | nothing open | Read it → |
R1 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 36 | MILLWORK M-8: MALLORQUINA CEILING PLAN AND TYPICAL MODULES & DETAILS (title block sheet no. A-450, Cortland Morgan Architect A-set) | Read for scope: nothing electrical on it. | nothing open | See the page → |
| not read |
| Open the page → |
2498 A set p14 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 14 | Enlarged Common Area Restroom Plans | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 14): Restroom floor plan outline only, no electrical devices shown. | not read | Open the page → |
2498 A set p9 Copy of 2498 A set 2025-0530 Revision 1.pdf · page 9 | Accessibility Notes and Details (For Reference) 1 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 9): ADA code text and clearance diagrams only, no electrical content. | not read | Open the page → |
2498 Revision 1 Notes p1 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 1 | Domo Architecture Transmittal - Revision 1 Notes (p.1) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 1): Cover letter listing architectural sheet revisions A-001 to A-008, no electrical drawing content. | not read | Open the page → |
2498 Revision 1 Notes p3 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 3 | Domo Architecture Transmittal - Revision 1 Notes (p.3) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 3): Lists revisions to A-111 through A-210 architectural sheets. | not read | Open the page → |
2498 Revision 1 Notes p4 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 4 | Domo Architecture Transmittal - Revision 1 Notes (p.4) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 4): Lists revisions to A-300 through M-300; narrative change log, not a drawing. | not read | Open the page → |
2498 Revision 1 Notes p5 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 5 | Domo Architecture Transmittal - Revision 1 Notes (p.5) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 5): Lists revisions to A-480 through M-300; narrative change log, no electrical sheets referenced yet. | not read | Open the page → |
2498 Revision 1 Notes p6 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 6 | Domo Architecture Transmittal - Revision 1 Notes (p.6) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 6): Narrative summary describing changes to E-100 through E-600 electrical sheets, but is a text change log, not a drawing with takeoff quantities. | not read | Open the page → |
2498 Revision 1 Notes p7 Copy of 2498 Revision 1 - Notes _ changes.pdf · page 7 | Domo Architecture Transmittal - Revision 1 Notes (p.7) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of 2498 Revision 1 - Notes _ changes.pdf, page 7): Narrative change log covering E-601 through P-301, signature page; no drawing content to take off. | not read | Open the page → |
rocklinelectric.net Mail Fwd Mango p1 rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf · page 1 | Email - Invitation to Bid (Rockline Electric), page 1 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (007-rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf, page 1): Forwarded bid invitation email cover with sender signature; administrative correspondence, no drawing. | not read | Open the page → |
rocklinelectric.net Mail Fwd Mango p2 rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf · page 2 | Email - Invitation to Bid (Rockline Electric), page 2 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (007-rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf, page 2): Bid invitation listing required trades including Electrical; administrative text, no electrical drawing/quantities. | not read | Open the page → |
rocklinelectric.net Mail Fwd Mango p3 rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf · page 3 | Email - Invitation to Bid (Rockline Electric), page 3 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (007-rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf, page 3): Bid invitation contact info and links; administrative correspondence, no electrical work shown. | not read | Open the page → |
A-004 page not recorded | ADA, Egress and Fire Safety Floor Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 4): Egress/ADA life-safety floor plan and code notes; no electrical devices or fixtures shown. | not read | — |
A-008 page not recorded | Cover Sheet / Master ADA Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 8): Cover sheet with drawing index limited to ADA reference sheets, no electrical scope. | not read | — |
A-091 page not recorded | CALGreen Applicable Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 16): Code compliance notes (water efficiency, VOC limits, waste management); no electrical scope. | not read | — |
A-140 page not recorded | Finishes & Furniture Layout Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 22): Finish/furniture layout and material samples; no electrical devices or fixtures. | not read | — |
A-420 page not recorded | Fitting Rooms Plan & Sections | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 32): millwork/finish tags only (FF/EQ), no light fixtures, outlets, or devices called out. | not read | — |
A-460 page not recorded | Millwork M-9 Mallorquina Wall Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 37): wood wall paneling section/elevation details only, no electrical content. | not read | — |
A-501 page not recorded | Door Type & Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of 2498 A set 2025-0530 Revision 1.pdf, page 40): storefront door P1 jamb/head/section details only, no electrical. | not read | — |
FP-1 Copy of 2498 SP 2025-0409 Bid Issue.pdf · page 1 | Fire Sprinkler Piping Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of 2498 SP 2025-0409 Bid Issue.pdf, page 1): Fire protection overhead sprinkler piping plan, sprinkler heads/hangers, not electrical scope. | not read | Open the page → |
M-100 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 1 | Mechanical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 1): HVAC specifications text only. | not read | Open the page → |
M-101 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 2 | Mechanical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 2): HVAC specifications text only. | not read | Open the page → |
M-102 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 3 | Mechanical General Notes, Schedules and Symbol List | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 3): duct/air outlet/AC unit schedules and mechanical symbol legend. | not read | Open the page → |
M-200 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 4 | Mechanical Demolition Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 4): existing ductwork/AHU/CU removal plan, no electrical. | not read | Open the page → |
M-300 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 5 | Mechanical Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 5): new ductwork and diffuser layout, no electrical. | not read | Open the page → |
M-400 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 6 | Mechanical Piping Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 6): refrigerant piping/condensate routing plan, no electrical. | not read | Open the page → |
M-500 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 7 | Mechanical Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 7): duct construction/hanging/diffuser details, no electrical. | not read | Open the page → |
M-501 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 8 | Mechanical Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 8): refrigeration piping, pipe penetration, condensing unit installation details, no electrical scope. | not read | Open the page → |
M-600 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 9 | Mechanical Title 24 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 9): Title 24 mechanical compliance forms. | not read | Open the page → |
M-601 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 10 | Mechanical Systems - Title 24 Compliance | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 10): Mechanical Title 24 energy compliance forms, no electrical scope. | not read | Open the page → |
M-602 Copy of 2498 M set 2025-0530 Revision 1.pdf · page 11 | Mechanical Systems - Title 24 Compliance | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of 2498 M set 2025-0530 Revision 1.pdf, page 11): Mechanical Title 24 compliance forms and declarations. | not read | Open the page → |
P-100 page not recorded | Plumbing Symbols, Details, and Riser Diagram | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of 2498 P set 2025-0530 Revision 1.pdf, page 1): Plumbing piping details/risers, water heater schedule; no electrical devices. | not read | — |
P-101 page not recorded | Plumbing Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of 2498 P set 2025-0530 Revision 1.pdf, page 2): Plumbing spec text only. | not read | — |
P-200 page not recorded | Plumbing Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of 2498 P set 2025-0530 Revision 1.pdf, page 3): Sanitary/domestic water plumbing plan, no electrical. | not read | — |
P-300 Copy of 2498 P set 2025-0530 Revision 1.pdf · page 4 | Plumbing Title 24 - Domestic Water Heating System | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of 2498 P set 2025-0530 Revision 1.pdf, page 4): Plumbing Title 24 compliance form. | not read | Open the page → |
P-301 Copy of 2498 P set 2025-0530 Revision 1.pdf · page 5 | Plumbing Title 24 - Domestic Water Heating System | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of 2498 P set 2025-0530 Revision 1.pdf, page 5): Plumbing Title 24 compliance form, declarations. | not read | Open the page → |
S-100 page not recorded | General Notes, Plans & Details (Structural) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of 2498 S set 2025-0519 Revision 1.pdf, page 1): Structural steel stud framing plan and details, no electrical. | not read | — |
S-200 page not recorded | Sections & Details (Structural) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of 2498 S set 2025-0519 Revision 1.pdf, page 2): Structural framing sections/details, no electrical. | not read | — |