Tier 1 (vector + text layer): read directly, no OCR. Sheet is 8 generic construction-detail sections, not a plan view, so no repeated device/fixture symbol population exists to group into symbol_groups -- the deliverable here is the text_facts locating the by-trade (EC/GC) callouts and Division-26 keyed notes that this run's takeoff line and coverage_gaps cite. Text extracted with PyMuPDF get_text(); page has /Rotate 90, so word/block geometry was taken back to displayed space via page.rotation_matrix before recording x/y/bbox below.
Names come from: no legend on this sheet, so NECA 100-2006 is what a name rests on. It is the baseline for what a symbol MEANS, never for matching shapes — proportions differ per firm. Confirming a name here is a correction, and corrections are what build the firm's file.
Scale is UNSET. Nothing on this sheet has been measured. The reader declined to infer a scale rather than guess one, so there is no raceway and no branch wire off this sheet — together the largest block of material on a job of this kind. Set it from the title block and measurement becomes available.
Put your name in to mark this sheet up. Looking needs no name.
zoom100%sheetcounts0 of 0 marks drawn
Page 6 of 000-Copy of 2498 A set 2025-0530 Revision 1.pdf, recorded by the read.
Fetching page 6…
0 changes on this sheet, each saved as it was made · not saved as reviewed yet