A quick set of criteria for the RRE team to check whether they want to bid this job or not. They come from sections 1 and 2 of the RRE Bid Intake Guideline →, which is the place to go when one of them is a judgement call.
Responsibility matrix found on a sheet (Copy of 2498 Revision 1 - Notes _ changes.pdf, page 2). Read it before deciding: it says who furnishes and installs fixtures, low-voltage cable, controls and equipment, which changes what RRE is bidding. The takeoff reads it too.
Source: rocklinelectric.net Mail - Fwd_ Mango -...ion - Invitation to bid DUE 05_08_2025.pdf (bid invitation).
Answers below were last saved by kelchlin on 10/3/2026, 5:43:46 PM. Changing one saves it.
| Criterion | Verdict | What it rests on |
|---|---|---|
| Union Project? | green | Recorded as non-union. |
| Government or Public Works job? | green | Recorded as private work. |
| Inside a Served Zone? | green | Inside a zone RRE works in. |
| Prevailing Wage job? | green | Not prevailing wage. |
| Fresno area over 5,000 sq ft? | green | Not a large Fresno-area job, so the capacity limit does not apply. |
| Work Type | green | Tenant improvement — the normal focus. |
| Night or off-hours work? | green | Normal hours. |
| Bid period adequate? | green | Enough time for a reliable estimate. |
| Rough Order of Magnitude Job Value | green | Not estimated yet. Information only: RRE bids from about $5,000 to $2 million, and the value never decides the recommendation. |
| Preferred Client | green | Not a preferred client. |
| Job Type | green | Restaurant — one of the preferred markets the firm actively looks for, where the field experience and the estimating history are strongest. |
Same project, other GCs: Mango Corte Test 2; mango-corte-10; Mango-Corte-14.
Recorded BID by kelchlin on 9/29/2026, 6:10:15 PM — pass. Recording again supersedes it; the decision stays readable either way.