Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 3 blank: project address, general contractor, area (sq ft). | Type them on Step 1. |
| Electrical drawings | pass | 15 sheets, all legible. | |
| Panel schedules | pass | On E-601. | |
| Single-line / riser | not included | Not included in the set. | Ask for the one-line if the job touches service, feeders or gear. |
| Lighting information | pass | 12 fixture lines. | |
| Equipment schedules | pass | 61 equipment connections. | |
| Specifications | warning | None received. | Ask for Division 26, or state the assumed methods on the proposal. |
| Utility / civil | pass | On E-101. | |
| Existing conditions | warning | No demolition read on a TI job. | Ask for the existing-conditions / demolition drawings. |
| Addenda / revisions | not checked | Base set only. | Check the bid portal for the latest revision before submitting. |
| Architectural drawings | not checked | None identified. | Open the set and confirm the architectural sheets are present. |
| Responsibility matrix / GC scope | not checked | None found in the set. | Ask for the GC scope letter / responsibility matrix, or RFI it. |