| # | Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|---|
| 1 | E-001 page 44 | GENERAL NOTES / COVER scale not set | 1 open question on the drawing. | open | Open → |
| 2 | E-103 page 50 | POWER PLAN scale not set | 4 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 3 | E-104 page 51 | LIGHTING PLAN scale not set | 11 open questions on the drawing. | open | Open → |
| 4 | E-601 page 54 | SINGLE LINE DIAGRAM & PANEL SCHEDULES scale not set | 5 open questions on the drawing. 5 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again.
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
LUTRON CONTROLS SYSTEM - LABOR ONLY The drawings say “vendor-furnished”. | Vendor | not stated | RRE installs / connects only | E-601 |
Symbols on this set. No symbol library was found on the drawings, and no engineering firm was identified from the title blocks, so there is no conventions file to fall back on either. This set is read against the default library alone: NECA 100-2006. It is the firm's baseline for what a symbol MEANS where a legend is silent, ambiguous or absent, and it is also the checklist of which symbol categories a plan of this kind ought to show. A line named from the baseline rather than from a legend is named by convention, not by the set. It is reported as 'named from NECA 100, confirm' and carries a semantic-risk flag — a misread convention is a 3× error that no percentage band expresses.
None yet.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
E-002 page 45 | GENERAL NOTES / SPECS (CONT.) scale not set | Read. | nothing open | Read it → |
E-501 page 52 | DETAILS (Manager Desk / Equipment Rack) scale not set | Read. | nothing open | Read it → |
E-502 page 53 | DETAILS (DTP / CBE Craft Bar) scale not set | Read. | nothing open | Read it → |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
E-101 page 49 | SITE / DT MENU BOARD PLAN | This sheet was indexed but not read for scope. The model did not mark it read. | nothing open | Read it → |
E-602 page 55 | LUTRON CONTROL DIAGRAM 1 scale not set | This sheet was indexed but not read for scope. The model did not mark it read. | nothing open | Read it → |
E-603 page 56 | LUTRON CONTROL DIAGRAM 2 scale not set | This sheet was indexed but not read for scope. The model did not mark it read. | nothing open | Read it → |
E-604 page 57 | LUTRON CONTROL DIAGRAM 3 scale not set | This sheet was indexed but not read for scope. The model did not mark it read. | nothing open | Read it → |
E-605 page 58 | LUTRON CONTROL DIAGRAM 4 scale not set | This sheet was indexed but not read for scope. The model did not mark it read. | nothing open | Read it → |
E-606 page 59 | LUTRON CONTROL DIAGRAM 5 scale not set | This sheet was indexed but not read for scope. The model did not mark it read. |
| nothing open |
| Read it → |
I-601 page not recorded | FF&E / EQUIPMENT SCHEDULE 1 | This sheet was indexed but not read for scope. The model did not mark it read. | not read | — |
I-602 page not recorded | FF&E / EQUIPMENT SCHEDULE 2 | This sheet was indexed but not read for scope. The model did not mark it read. | not read | — |