Read from the PDF text layer via page.get_text('words'), filtered to circuit-tag patterns ('A-nn', 'B-(nn,mm)') and cross-referenced by circuit number against the panel schedule read visually off E-601. Trust text tag counts over visual sweeps (tier-1 rule). Symbol/device vector geometry (receptacle body shapes) was NOT separately extracted this run -- marks below represent the circuit homerun/device callout TEXT, not a traced symbol outline.
Names come from: no legend on this sheet, so NECA 100-2006 is what a name rests on. It is the baseline for what a symbol MEANS, never for matching shapes — proportions differ per firm. Confirming a name here is a correction, and corrections are what build the firm's file.
Scale is UNSET. Nothing on this sheet has been measured. The reader declined to infer a scale rather than guess one, so there is no raceway and no branch wire off this sheet — together the largest block of material on a job of this kind. Set it from the title block and measurement becomes available.
Put your name in to mark this sheet up. Looking needs no name.
zoom100%sheetcounts16 of 16 marks drawn
Page 53 of BID SET 101045-001_2nd Submittal Set _USE - INCLUDES E SHEETS_.pdf, which is the page the reader recorded. Nothing has confirmed it against the title block. This page has not been confirmed. Check the title block against the sheet name above before marking anything up.
Fetching page 53…
0 changes on this sheet, each saved as it was made · not saved as reviewed yet
By symbol13 of 13 shown
16
all marks
hover a group to filter the plan
Counted here, not marked on the drawing
The takeoff counted these from this sheet (circuit labels, the panel schedule) without placing a mark. Marks for drawn symbols come with the symbol-counting step.