| Priced As per Plan & Spec Dated | Copy of Drawings.pdf |
|---|---|
| Addendum Acknowledged | None received |
| Bid RFI | 1 |
| Bid Submission # | [Bid Submission # — not answered] |
| Private / Prevailing Wage | Private |
| Visited Site / Job Walk | [Visited Site / Job Walk — not answered] |
| Project Schedule (start date) | TBD |
| Project Schedule (completion Date) | TBD |
| Project Performance Bond | [Project Performance Bond — not answered] |
| Day / Night Works | Day Work (Mon-Friday) |
| Overtime | [Overtime — not answered] |
| Type of Construction | TI — Retail |
| Project SQ.FT | 2,630 SF |
| Estimator Assigned / Bid Out | kelchlin [phone — not answered][email — not answered] |
| Bid Valid through | 60 days (Expires 12/4/2026) |


| From | RRE INC. ELECTRICAL CONTRACTORS 3449 Freedom Park Drive, North Highlands CA 95660 |
|---|---|
| Date | 10/5/2026 |
| To | varun-retail-2 2219 El Camino Real, Redwood City, CA 94063 |
| COST# | DESCRIPTION | COST |
|---|---|---|
| BASE BID | Includes Interior Building and Site Electrical Works per plan & spec. | $0.00 |
| FINAL COST | BASE BID | $0.00 |

Change Order / Time and material rate as needed:
| Trade | Per Hr rate |
|---|---|
| Electrician | TBD |
| Project Manager | TBD |
| Estimator | TBD |
| Superintendent | TBD |
| Truck Roll | TBD |
| Equipment | Per Day Rate |
|---|---|
| Equipment Operator | TBD |
| Labor | TBD |
| 305 Mini Excavator | TBD |
| TL8 Skid Steer | TBD |
| Auger Machine | TBD |
| 12K Excavator | TBD |
| Compactor | TBD |


RRE Inc. Electrical Contractors shall not be held liable for any delays in the delivery of electrical gear, equipment, or materials caused by manufacturers, suppliers, shipping carriers, or other third parties beyond our control. This includes, but is not limited to, production backlogs, material shortages, shipping or freight disruptions, or other supply chain issues. In such cases, all project schedules, milestones, and completion deadlines shall be extended on a day-for-day basis equal to the length of the delay. No liquidated damages, penalties, or back charges shall be applied to RRE Inc. Electrical Contractors as a result of such delays. Furthermore, RRE Inc. reserves the right to submit for approval equivalent or substitute materials or to resequence work in a commercially reasonable manner to minimize the impact of such delays.
By approving this submittal, the Owner, Engineer, and/or General Contractor acknowledge that RRE Inc. Electrical Contractors is not responsible for verifying whether the submitted equipment or materials fully align with the electrical design intent. If the approved submittals do not conform to the original design concept or performance criteria, RRE Inc. shall be held harmless from any resulting issues, defects, or performance deficiencies in the electrical system.
All lead times provided are Estimated Ship Dates (ESDs) and are based on information available at the time of issuance. These dates are subject to change without notice due to factors beyond the control of RRE Inc. Electrical Contractors, including but not limited to supplier or manufacturer production schedules, raw material availability, and shipping logistics. RRE Inc. makes no guarantees regarding actual ship or delivery dates and shall not be held liable for any impacts resulting from changes to the ESD.

F = FURNISH/SUPPLY I = INSTALL N/A = NOT APPLICABLE BO = BY OTHERS E = EXISTING
| BUILDING / INTERIOR — LIGHTING WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | LIGHT FIXTURES | |||
| F | I | LAMPS | |||
| F | I | EXIT LTG’S | |||
| F | I | EMERGENCY LTG’S | |||
| F | I | LIGHT SUPPORTS | |||
| I | LIGHT CONTROLS | ||||
| F | I | LTG COMMISSIONING | |||
| F | I | T-24 CERTIFICATION | |||
| N/A | BATTERY BACKUP / EM DRIVERS | ||||
| N/A | LTG INVERTERS | ||||
| N/A | TIME CLOCK | ||||
| N/A | LTG CONTACTORS | ||||
| N/A | PHOTOCELL | ||||
| N/A | OVERRIDE SWITCH | ||||
| F | I | LTG CONTROL PANEL (LCP) | |||
| N/A | POWER PACK / DIMMING RELAY | ||||
| N/A | EMS SYSTEM | ||||
| N/A | HOOD LIGHT / POWER | ||||
| N/A | SUBMISSION OF LTG CONTROL PLAN / DESIGN | ||||
| N/A | FREEZER / COOLER LTGS | ||||
| F | I | WORK FROM EXISTING CIRCUITRY | |||
| N/A | PER PLAN & SPEC LIGHT PACKAGE | ||||
| N/A | VE LIGHT PACKAGE | ||||
| EXTERIOR — LIGHT WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| N/A | PARKING POLE LTG’S | ||||
| F | I | EXTERIOR BLDG LTG | |||
| N/A | LTG POLE BASE | ||||
| N/A | TRENCH & BACKFILL PARKING POLE LTG MAX 2FT DEPTH | ||||
| N/A | BACKFILL MATERIAL - NATIVE SOIL | ||||
| N/A | BO | COMPACT TRENCH | |||
| N/A | BO | COMPACTION TEST | |||
| N/A | PARKING POLE LTG BRANCH CIRCUIT | ||||
| N/A | SCH 40 PVC CONDUIT FOR BRANCH CIRCUIT | ||||
| N/A | GROUND ROD PARKING POLE LTG & N-9 CHRISTY BOX | ||||
| N/A | RE-LOCATED EXISTING PARKING POLE LTG | ||||
| N/A | TIE RELOCATED PARKING POLE LTG TO THE EXISTING CIRCUITS | ||||
| SPECIALTY ELECTRICAL WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| N/A | INSTALL DRIVE THRU LOOP DETECTORS | ||||
| N/A | CONCRETE SAW CUTTING FOR DRIVE THRU LOOP | ||||
| BO | SHOOTING OF CEILING WIRES FOR LIGHT FIXTURES | ||||
| BO | OPENING UP DRYWALL OR CUTTING OF CEILING TILES FOR LIGHTS & PLUGS | ||||

F = FURNISH/SUPPLY I = INSTALL N/A = NOT APPLICABLE BO = BY OTHERS E = EXISTING
| POWER WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | RECEPTACLES PER PLAN | |||
| F | I | J-BOXES PER PLAN | |||
| F | I | DISCONNECT SWITCHES / FUSES | |||
| N/A | FLOOR BOXES / POWER POLES | ||||
| N/A | POWER TO KITCHEN EQUIPMENT | ||||
| CONCRETE SAW CUTTING / X-RAY, CORE DRILL & PATCH BACK | |||||
| F | I | POWER TO BUILDING SIGNAGE | |||
| N/A | FIRE STOPPING / CAULKING | ||||
| N/A | POWER TO ANSUL / HOOD SYSTEM | ||||
| N/A | POWER TO WALK-IN REFRIGERATOR / FRIDGE | ||||
| N/A | SEAL CONDUITS IN FREEZER AREA | ||||
| F | I | CONDUIT RACKS / HANGERS / UNISTRUT SUPPORTS | |||
| F | I | TELEPHONE TERMINAL BACKBOARD | |||
| N/A | POWER TO DIGITAL MENU BOARD | ||||
| N/A | POWER TO SITE SIGNAGE SIGN | ||||
| F | I | POWER / RACEWAY TO FUTURE EV CHARGER | |||
| N/A | POWER / RACEWAY TO MONUMENT SIGN | ||||
| N/A | POWER TO EXHAUST FANS | ||||
| N/A | POWER TO FIRE ALARM PANEL | ||||
| N/A | 120V POWER FOR MODULAR FURNITURE / POS | ||||
| N/A | VEHICLE LOOP DETECTORS CONDUITS / INSTALL | ||||
| N/A | POWER FOR HAND DRYER | ||||
| N/A | TEMP POWER TO MAN HOIST | ||||
| N/A | TEMP POWER TO ELEVATOR | ||||
| MECHANICAL / PLUMBING POWER WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| N/A | 120V POWER TO ELECTRIC WATER HEATER | ||||
| N/A | DISCONNECT SWITCH FOR WATER HEATER & EQUIPMENT CONNECTION | ||||
| N/A | 120V POWER TO RECIRCULATION PUMP | ||||
| F | I | POWER FOR TAMPER / FLOW SWITCH | |||
| N/A | POWER FOR FIRE PUMP / CONTROLLER ETC | ||||
| N/A | POWER FOR SUMP PUMP | ||||
| N/A | POWER FOR TRASH COMPACTOR | ||||
| N/A | POWER FOR PATIO HEATER | ||||
| N/A | POWER / RACEWAY FOR ROOF SENSOR | ||||
| N/A | 120V POWER TO DUCT SMOKE DETECTORS | ||||

F = FURNISH/SUPPLY I = INSTALL N/A = NOT APPLICABLE BO = BY OTHERS E = EXISTING
| SINGLE LINE WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| BO | UTILITY DRAWINGS | ||||
| BO | TRANSFORMER PAD | ||||
| BO | UTILITY TRANSFORMER | ||||
| BO | TRANSFORMER TIE-IN | ||||
| BO | PRIMARY FEEDERS CONDUITS | ||||
| BO | PRIMARY FEEDER WIRES / CONDUCTORS | ||||
| BO | SECONDARY FEEDER CONDUITS | ||||
| BO | SECONDARY FEEDER CONDUCTORS | ||||
| BO | PICK UP 5FT FROM THE JT TO BUILDING FOR SECONDARY FEEDER CONDUIT | ||||
| F | I | MAIN SWITCHBOARD / SERVICE | |||
| F | I | PANELBOARDS | |||
| BUILDING INTERIOR TRANSFORMER | |||||
| TRANSFORMER BRACKETS - FOR HANGING ETC | |||||
| F | I | PANEL BREAKERS | |||
| F | I | PULL CANS / GUTTERS | |||
| F | I | PANEL FEEDER CONDUIT PER PLAN | |||
| F | I | PANEL FEEDER WIRES / CONDUCTORS PER PLAN | |||
| F | I | ELECTRICAL DISCONNECT PER PLAN | |||
| E | MAIN BREAKER | ||||
| N/A | E | GROUNDING WORKS PER PLAN | |||
| CONCRETE PAD FOR GEAR / EQUIP | |||||
| N/A | EXTEND EXISTING FEEDERS | ||||
| N/A | DEMO EXISTING PANELS | ||||
| N/A | CONCRETE CORE PENETRATION FOR THE FEEDERS | ||||
| N/A | FUTURE SOLAR STUB UPS | ||||
| N/A | NEW BREAKER IN EXISTING PANEL | ||||
| N/A | RE-LOCATION OF PANEL PER PLAN | ||||
| LOW VOLTAGE WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | TELE / DATA DROPS PER PLAN | |||
| F | I | CONDUITS WITH PULL STRING ONLY FOR TELE / DATA DROPS | |||
| N/A | ALL LOW-VOLTAGE WIRING | ||||
| BO | ALL LOW VOLTAGE TERMINATIONS | ||||
| N/A | ALL LOW-VOLTAGE PROGRAMMING | ||||
| BO | ALL LOW-VOLTAGE DEVICES | ||||
| N/A | RACEWAYS / BACK BOXES FOR CAMERAS | ||||
| N/A | RACEWAYS / BACK BOXES FOR SPEAKERS | ||||
| N/A | RACEWAYS / BACK BOXES FOR ACCESS CONTROLS | ||||
| N/A | RACEWAYS FOR ERCS SYSTEMS | ||||
| N/A | RACEWAYS / BACK BOXES FOR FIRE ALARM SYSTEM | ||||
| N/A | RACEWAYS / BACK BOXES FOR TWO-WAY COMMUNICATIONS | ||||
| N/A | FIRE WATCH | ||||
| N/A | PUSH BUTTON / DOOR BUZZER / TRANSFORMER | ||||
| N/A | MAIN TELECOM LINE EXTENSION | ||||
| HVAC CONTROL WIRING | |||||
| ROOFTOP WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | SERVICE RECEPTACLES / POWER | |||
| F | I | POWER TO RTU’S / HEATPUMPS | |||
| F | I | POWER TO ROOF TOP EQUIPMENT | |||
| F | I | CONDUITS / RACKS | |||
| N/A | BO | ROOF PENETRATION (CUTTING) & SEALING (PATCH) | |||
| F | I | DISCONNECT SWITCHES PER PLAN | |||
| N/A | POWER FOR RTU HAVING INTEGRAL DISCONNECT | ||||
| N/A | FUTURE SOLAR CONDUIT | ||||

F = FURNISH/SUPPLY I = INSTALL N/A = NOT APPLICABLE BO = BY OTHERS E = EXISTING
| UNDERGROUND EXCAVATION WORKS | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| N/A | SITE PARKING POLE LIGHTS | ||||
| N/A | OFF SITE LIGHT | ||||
| N/A | JOINT TRENCH | ||||
| EV CHARGER | |||||
| N/A | DRIVE THRU MENU BOARDS / SIGNAGE ETC | ||||
| N/A | TRANSFORMER PAD | ||||
| N/A | PRIMARY FEEDERS | ||||
| N/A | SECONDARY FEEDERS | ||||
| N/A | TELEPHONE / DATA LINE | ||||
| N/A | OFF-HAULING EXCESS SOIL | ||||
| N/A | COMPACT ELECTRICAL TRENCHES | ||||
| N/A | COMPACTION TEST | ||||
| N/A | USE OF 1FT SAND ON BACKFILL | ||||
| N/A | USE OF 3 FT AB MATERIAL ON BACKFILL | ||||
| N/A | USE OF NATIVE SOIL IN BACKFILL MATERIAL | ||||
| N/A | CONCRETE SAW CUTTING / PATCHBACK | ||||
| N/A | BO | DRIVE-THRU LOOP CONCRETE SAW CUTTING | |||
| N/A | ASPHALT / BLACKTOP REMOVAL | ||||
| N/A | ASPHALT / BACK TOP PATCHBACK | ||||
| N/A | TRAFFIC-RATED PULL BOX | ||||
| N/A | BO | TRAFFIC CONTROLS | |||
| SAFE OFF / DEMO / TEMP LIGHT / POWER | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | SAFE OFF AT THE PANEL | |||
| N/A | DEMO WORKS | ||||
| N/A | DISPOSAL OF OLD LAMPS & FIXTURES / GEAR | ||||
| N/A | TEMP CONSTRUCTION STRING LTG | ||||
| N/A | SO CORD & SPIDER BOXES | ||||
| DIRECT JOB EXPENSE | |||||
|---|---|---|---|---|---|
| F | I | N/A | BO | E | SCOPE |
| F | I | MOBILIZATION | |||
| F | I | PROJECT MANAGEMENT FEES | |||
| F | I | OFFICE ADMIN / INSURANCE | |||
| F | I | RED / LINE / AS BUILT DWG | |||
| F | I | SAFETY / PPE COST | |||
| F | I | WARRANTY - 1 YEAR ON INSTALL | |||
| F | I | WARRANTY - 1 YEAR ON RRE FURNISHED EQUIPMENT / LTGS | |||
| F | I | FOREMAN / VEHICLE ALLOWANCE | |||
| F | I | PROJECT CLOSE OUT DOCUMENTS | |||
| RESPONSIBILITY MATRIX | |
|---|---|
| EQUIPMENT | PROVIDER |
| LIGHT FIXTURES | BY RRE |
| LIGHT CONTROLS | ? |
| SWITCHGEAR MSB | BY RRE |
| SWITCHGEAR / PANELS PER PLAN | BY RRE |
| LOW VOLTAGE DEVICES | BY OTHERS |
| LOW VOLTAGE WIRING | BY OTHERS |
| LOW VOLTAGE TERMINATION & PROGRAMMING | BY OTHERS |
| EMS SYSTEM | N/A |
| POWER POLE | N/A |
| ALL FA DEVICES | N/A |
| CONCRETE CORE DRILL | BY OTHERS |
| DRIVE THRU LOOPS | N/A |

Below is the Exclusion that applies if not stated in the scope of work above

Payments shall be made each thirty days as the work progresses. The entire amount of the contract shall be paid within thirty days after completion.
Service and Finance Charges are applicable on past accounts at the rate of 1 ½ percent per month on amounts thirty (30) days past due, which is equal to an annual percentage rate of 18 percent. Such charges are shown as “service charges”. There is no service charge if accounts are paid within thirty days of the end of the month in which purchases are made.
Any alteration or deviation from the above specifications involving the extra cost of material and/or labor will only be executed upon written orders for the same and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing.
The contractor agrees to carry Workman’s Compensation and Public Liability Insurance and also to pay all Sales Taxes, Old Age Benefits, and Unemployment Compensation Taxes upon the material and labor furnished under this contract, as required by the United States Government and the State in which this work is performed.
Respectfully submitted,
Note: This proposal may be withdrawn by us if not accepted within 60 days of the proposal date.
You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which the undersigned agrees to pay the amount mentioned in the said proposal, and according to the terms thereof. I also agree to pay all reasonable costs, charges, and attorney’s fees that may accrue hereon after any default in payments.
2219 El Camino Real, Redwood City, CA 94063 · Engineered by MATRISCOPE ENGINEERING · Bid 2026-10-02
| E1.0 | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS |
| E1.0 | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS |
| E1.1 | ELECTRICAL SITE PLAN |
| E1.1 | ELECTRICAL SITE PLAN |
| E2.0 | ELECTRICAL TITLE 24 INTERIOR PART 1 |
| E2.0 | ELECTRICAL TITLE 24 INTERIOR PART 1 |
| E2.1 | ELECTRICAL TITLE 24 INTERIOR PART 2 |
| E2.1 | ELECTRICAL TITLE 24 INTERIOR PART 2 |
| E2.2 | ELECTRICAL TITLE 24 EXTERIOR PART 1 |
| E2.2 | ELECTRICAL TITLE 24 EXTERIOR PART 1 |
| E2.3 | ELECTRICAL TITLE 24 EXTERIOR PART 2 |
| E2.3 | ELECTRICAL TITLE 24 EXTERIOR PART 2 |
| E3.0 | ELECTRICAL POWER & ROOF PLAN |
| E3.0 | ELECTRICAL POWER & ROOF PLAN |
| E4.0 | ELECTRICAL LIGHTING PLAN |
| E4.0 | ELECTRICAL LIGHTING PLAN |
| E5.0 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE |
| E5.0 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE |
| E6.0 | ELECTRICAL DETAILS |
| E6.0 | ELECTRICAL DETAILS |
| E7.0 | ELECTRICAL SPECIFICATIONS |
| E7.0 | ELECTRICAL SPECIFICATIONS |
| A1.1 | FLOOR PLAN, NOTES & WALL TYPE LEGEND |
| A1.2 | REFLECTED CEILING PLAN, DOOR TYPES, DOOR & WINDOW SCHEDULES & NOTES |
| A2.1 | EXTERIOR ELEVATIONS |
| A2.2 | EXTERIOR ELEVATIONS |
| M0.2 | MECHANICAL SCHEDULES AND DETAILS |
| M2.1 | MECHANICAL FLOOR PLAN |
| M2.2 | MECHANICAL ROOF PLAN |
| SD1 | SITE PLAN |
| SD2 | SITE DETAILS |
| SD3 | SITE DETAILS |
| SD4 | SITE DETAILS |
| SN1 | STRUCTURAL NOTES |
| — | SP.5 TECHNICAL SPECIFICATIONS |
| DS1 | STRUCTURAL FOUNDATION DETAILS |
Symbols were read against the set’s own legend (E1.0).
Nothing has been accepted yet, so the scope list is empty. This is the correct behaviour: the proposal is generated from accepted lines and never typed.
Every scope line cites the sheet the number was read from, taken straight from the model’s provenance rather than reconstructed by hand. Back to the estimate →