| # | Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|---|
| 1 | E4.0 page 60 | ELECTRICAL LIGHTING PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 2 | E4.0 page 60 | ELECTRICAL LIGHTING PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 3 | SD3 page 9 | SITE DETAILS (Trash enclosure plan & elevations, vacuum equipment, bike rack, gate details) | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again.
The RRE item carries no price for the part named, so the estimate has the install labor and rough-in only, and the vendor or sub prices the rest. Send the lighting and gear lists from Material list & vendor quotes.
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
LIGHT FIXTURE TYPE C - EXTERIOR WALL SCONCE, LSI XPWS3-WT-LED-48-350-UE-PCI120, 55W exterior wall, west by panel H and south wall, circuit H-5c, photocontrol per SN 8 | LED WALL SCONCE - MED | 2 ea | E4.0 |
LIGHT FIXTURE TYPE D - WALL MOUNTED LIGHT FIXTURE, LSI SW-2-20L-830-UNV, 16W fire riser room / rear door, circuit H-1e | LED WALL SCONCE - MED | 1 ea | E4.0 |
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
CIRCUIT BREAKER 200A 3P IN SWITCHBOARD MSB (FEEDER TO PANEL H) Distribution breaker for panel H | the gear itself (no RRE item picked yet) | 1 ea | E5.0 |
PANELBOARD H 200A MCB 3P 225A BUS 120/208V 3PH 4W 42 CKT 22KAIC BOLT-ON SURFACE MOUNTED (N) panel H in tenant space beside tel/data backboard | 200/42 120/208V PNL 3PH | 1 ea | E5.0 |
SWITCHBOARD AND BREAKER OPERATIONAL CHECK AND TORQUE TEST (MSB 800A AND PANEL H), BY INDEPENDENT TESTING LABORATORY Spec 16040 3.02 transformer and breaker operational check: clean, torque connections, verify operation, relay test | the gear itself (no RRE item picked yet) |
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
MAIN SWITCHBOARD MSB 800A 208Y/120V 3PH 4W NEMA 3R 65KAIC WITH 800A 3P 100% RATED MAIN BREAKER, UTILITY METERING SECTION Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
FEEDER CONDUIT 2" (MSB TO PANEL H; UNDERGROUND PVC SCH 40 WITH RGS ELBOWS PER E1.1 SN 1) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
LIQUIDTIGHT FLEXIBLE METAL CONDUIT WHIP 1" MIN 24" WITH CONNECTORS (AC UNIT CONNECTION) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E3.0 |
EQUIPMENT CONNECTION EVSE 208V 1PH 30A (CHARGEPOINT CT4011-GW1) The drawings say “owner/vendor furnished”. | Owner | not stated | RRE installs / connects only | E1.1 |
CONDUIT 1" (EV FEEDERS, UNDERGROUND PVC SCH 40 WITH RGS ELBOWS/RISERS) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
MAIN SWITCHBOARD 800A 208Y/120V 3PH 4W NEMA 3R 65KAIC, 800A 3P 100% MAIN, UTILITY METERING |
Symbols on this set. A symbol list was found on the drawings: E1.0 — ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS. The project legend is authoritative for this set and outranks everything else — NECA 100-2006 itself allows a drawing to use non-standard symbols provided the legend explains them. NECA 100-2006 stays underneath it for anything the legend leaves silent, and no conventions file exists for MATRISCOPE ENGINEERING.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
E3.0 page 59 | ELECTRICAL POWER & ROOF PLAN | Read. Confirmed with 4 questions still open; the Takeoff lists them. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:16 PM | Open to reopen or edit → |
E3.0 page 59 | ELECTRICAL POWER & ROOF PLAN | Read. Confirmed with 4 questions still open; the Takeoff lists them. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:16 PM | Open to reopen or edit → |
E5.0 page 61 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE scale not set | Read. Confirmed with 4 questions still open; the Takeoff lists them. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:17 PM | Open to reopen or edit → |
E5.0 page 61 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE scale not set | Read. Confirmed with 4 questions still open; the Takeoff lists them. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:17 PM | Open to reopen or edit → |
E7.0 page 63 | ELECTRICAL SPECIFICATIONS scale not set | Read. Confirmed with 2 questions still open; the Takeoff lists them. | ✓ confirmed |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
Drawings p28 Copy of Drawings.pdf · page 28 | SP.5 TECHNICAL SPECIFICATIONS (M I Architects; Sections 084113 tail, 087100 Door Hardware, 088000 Glazing, 092400 Cement Plastering, 092900 Gypsum Board) | Read for scope: nothing electrical on it. | nothing open | See the page → |
A1.1 Copy of Drawings.pdf · page 15 | FLOOR PLAN, NOTES & WALL TYPE LEGEND | Read for scope: nothing electrical on it. | nothing open | See the page → |
A1.2 Copy of Drawings.pdf · page 16 | REFLECTED CEILING PLAN, DOOR TYPES, DOOR & WINDOW SCHEDULES & NOTES | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.1 Copy of Drawings.pdf · page 18 | EXTERIOR ELEVATIONS | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.2 Copy of Drawings.pdf · page 19 | EXTERIOR ELEVATIONS | Read for scope: nothing electrical on it. | nothing open | See the page → |
DS1 page 36 | STRUCTURAL FOUNDATION DETAILS scale not set |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
Drawings p1 Copy of Drawings.pdf · page 1 | Cover Sheet | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 1): Cover: project info, code analysis, general notes, sheet index; no EC work shown. | not read | Open the page → |
Drawings p2 Copy of Drawings.pdf · page 2 | Abbreviations, Legend & Conditions of Approval | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 2): Abbreviations, symbol legend and city conditions of approval text. | not read | Open the page → |
Drawings p24 Copy of Drawings.pdf · page 24 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 24): Architectural specs (membrane curing, metal fabrications, carpentry, roofing); no Div 26-28. | not read | Open the page → |
Drawings p25 Copy of Drawings.pdf · page 25 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 25): Architectural specs (underlayment, roofing, sheet metal, insulation); no Div 26-28. | not read | Open the page → |
Drawings p26 |
| 1 ea |
| E7.0 |
| — |
| not stated |
| Struck: not in this bid |
| E1.1 |
FUSE 40A 250V CURRENT-LIMITING CLASS RK1/J Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
EV CHARGER CONNECTION - CHARGEPOINT CT4011-GW1 EVSE 208V 1PH 30A (OFCI, EC INSTALL & CONNECT) The drawings say “ofci”. | Owner | EC | RRE installs / connects only | E1.1 |
JUNCTION BOX WEATHERPROOF AT EV CHARGER (HARD-WIRED EQUIPMENT CONNECTION) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
1" RGS PVC-COATED ELBOW / RISER Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
5" PVC SCH 40 CONDUIT UNDERGROUND - PG&E SERVICE SECONDARY Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
5" RGS PVC-COATED ELBOW Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
WEATHERPROOF J-BOX, EXTERIOR WALL, SIGNAGE RRE carries the line; the read says “sign itself by others”. | Others | not stated | RRE carries it; a part is by others | E3.0 |
2" RGS PVC-COATED ELBOW / RISER Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
#3/0 AWG BARE CU GROUNDING ELECTRODE CONDUCTOR (GEC) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CONCRETE WEDGE ANCHOR 3/8" DIA. SIMPSON STRONG-BOLT 2, 2-1/2" NOMINAL EMBED, SWITCHBOARD TO HOUSEKEEPING PAD Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | DS1 |
| Open to reopen or edit → |
E7.0 page 63 | ELECTRICAL SPECIFICATIONS scale not set | Read. Confirmed with 2 questions still open; the Takeoff lists them. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:17 PM | Open to reopen or edit → |
SD1 page 7 | SITE PLAN (architectural, M I Architects, PDF page 7) | Read. Confirmed with 1 question still open; the Takeoff lists it. | ✓ confirmed by Adam Kelchlin · Oct 5, 7:18 PM | Open to reopen or edit → |
| Read. |
| nothing open |
| Read it → |
E1.0 page 53 symbol list | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS scale not set | Read. | nothing open | Read it → |
E1.0 page 53 symbol list | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS scale not set | Read. | nothing open | Read it → |
E1.1 page 54 | ELECTRICAL SITE PLAN | Read. | nothing open | Read it → |
E1.1 page 54 | ELECTRICAL SITE PLAN | Read. | nothing open | Read it → |
E2.0 page 55 | ELECTRICAL TITLE 24 INTERIOR PART 1 scale not set | Read. | nothing open | Read it → |
E2.0 page 55 | ELECTRICAL TITLE 24 INTERIOR PART 1 scale not set | Read. | nothing open | Read it → |
E2.1 page 56 | ELECTRICAL TITLE 24 INTERIOR PART 2 scale not set | Read. | nothing open | Read it → |
E2.1 page 56 | ELECTRICAL TITLE 24 INTERIOR PART 2 scale not set | Read. | nothing open | Read it → |
E2.2 page 57 | ELECTRICAL TITLE 24 EXTERIOR PART 1 scale not set | Read. | nothing open | Read it → |
E2.2 page 57 | ELECTRICAL TITLE 24 EXTERIOR PART 1 scale not set | Read. | nothing open | Read it → |
E2.3 page 58 | ELECTRICAL TITLE 24 EXTERIOR PART 2 scale not set | Read. | nothing open | Read it → |
E2.3 page 58 | ELECTRICAL TITLE 24 EXTERIOR PART 2 scale not set | Read. | nothing open | Read it → |
E6.0 page 62 | ELECTRICAL DETAILS scale not set | Read. | nothing open | Read it → |
E6.0 page 62 | ELECTRICAL DETAILS scale not set | Read. | nothing open | Read it → |
M0.2 page 40 | MECHANICAL SCHEDULES AND DETAILS scale not set | Read. | nothing open | Read it → |
M2.1 Copy of Drawings.pdf · page 44 | MECHANICAL FLOOR PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
M2.2 Copy of Drawings.pdf · page 45 | MECHANICAL ROOF PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
SD2 Copy of Drawings.pdf · page 8 | SITE DETAILS | Read for scope: nothing electrical on it. | nothing open | See the page → |
SD4 Copy of Drawings.pdf · page 10 | SITE DETAILS (M I Architects) -- details 7 EV Charging Equipment Plan & Elevation(s) (For Future Use), 9 Handrail, 8 Stair Section, 14 Accessible Ramp Section, 17 EV Accessible Parking Stall (For Future Use), 19 Accessible Ramp Detail Plan; 3,4,5,10,15,20 Not Used | Read for scope: nothing electrical on it. | nothing open | See the page → |
SN1 Copy of Drawings.pdf · page 31 | STRUCTURAL NOTES (STRUCTURAL GENERAL NOTES, ISE Engineers, PDF page 31) | Read for scope: nothing electrical on it. | nothing open | See the page → |
Technical Specifications |
| Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 26): Architectural specs (roofing, flashing, sheet metal, sealants); no Div 26-28. |
| not read |
| Open the page → |
Drawings p27 Copy of Drawings.pdf · page 27 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 27): Hollow metal/wood doors, aluminum storefront specs; electrified hardware only referenced to 087100 on SP.5. | not read | Open the page → |
Drawings p29 Copy of Drawings.pdf · page 29 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 29): Gypsum board, acoustical ceilings, tile, flooring specs; no Div 26-28 work. | not read | Open the page → |
Drawings p3 Copy of Drawings.pdf · page 3 | 2022 CALGreen Notes & Non-Residential Checklist | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 3): CALGreen checklist and notes; code text only. | not read | Open the page → |
Drawings p30 Copy of Drawings.pdf · page 30 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 30): Painting, wall panels, toilet compartments and accessories specs. | not read | Open the page → |
Drawings p4 Copy of Drawings.pdf · page 4 | 2022 CALGreen Non-Residential Checklist (Continued) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 4): CALGreen checklist continued; code text only. | not read | Open the page → |
Drawings p5 Copy of Drawings.pdf · page 5 | 2022 CALGreen Non-Residential Checklist (Continued) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 5): CALGreen checklist, signature declarations and letter. | not read | Open the page → |
A1.5 Copy of Drawings.pdf · page 17 | Roof Plan & Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 17): Roofing, drains, curbs for future HVAC units; no electrical shown. | not read | Open the page → |
A3.1 Copy of Drawings.pdf · page 20 | Building Sections | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 20): Building sections: structure, insulation, roofing. | not read | Open the page → |
A3.2 Copy of Drawings.pdf · page 21 | Wall Sections & Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 21): Parapet/fire-rated wall sections and main entrance section; zoomed, no fixtures, devices or supports. | not read | Open the page → |
A5.1 Copy of Drawings.pdf · page 22 | Building Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 22): Accessibility symbol, tactile (non-powered) exit sign, threshold, storefront and wall details; no electrical. | not read | Open the page → |
A5.3 Copy of Drawings.pdf · page 23 | Building Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 23): Awning section/framing, roof drain, parapet cap, pilaster plans; zoomed, no lighting or devices. | not read | Open the page → |
C1 page not recorded | Civil Title Sheet | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 11): Civil title sheet, index map and civil notes. | not read | — |
C2 page not recorded | Grading & Drainage Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 12): Civil grading and storm drainage; light pedestal/switchgear shown only for reference. | not read | — |
C3 page not recorded | Utility Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 13): Civil water, sewer and fire service utilities. | not read | — |
C4 page not recorded | Erosion Control Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 14): Erosion control BMPs. | not read | — |
DS2 Copy of Drawings.pdf · page 37 | General Wood Framing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 37): Wood framing, shear wall and diaphragm details. | not read | Open the page → |
DS4 Copy of Drawings.pdf · page 38 | Structural Roof Framing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 38): Roof framing, parapet, mechanical curb and awning connection details. | not read | Open the page → |
M0.1 Copy of Drawings.pdf · page 39 | Mechanical Specifications, Legend and General Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 39): HVAC notes, specs and legend; no electrical scope beyond symbols. | not read | Open the page → |
M0.3 Copy of Drawings.pdf · page 41 | Mechanical T24 Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 41): Title 24 mechanical compliance forms. | not read | Open the page → |
M0.4 Copy of Drawings.pdf · page 42 | T24 Envelope Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 42): Title 24 NRCC-PRF-E envelope compliance forms; no EC work shown. | not read | Open the page → |
M0.5 Copy of Drawings.pdf · page 43 | T24 Envelope Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 43): Title 24 envelope compliance forms and declarations; no EC work shown. | not read | Open the page → |
P0.1 Copy of Drawings.pdf · page 46 | Plumbing General Notes, 2022 Cal Green, Specification, Legend and Symbols | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 46): Plumbing notes, specs and legend only. | not read | Open the page → |
P0.2 Copy of Drawings.pdf · page 47 | Plumbing Schedules | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 47): Plumbing fixture/pipe schedules; no powered fixtures (trap primer is pressure-activated). | not read | Open the page → |
P2.0 Copy of Drawings.pdf · page 48 | Plumbing Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 48): Site water/sewer/grease interceptor connections only. | not read | Open the page → |
P2.1 Copy of Drawings.pdf · page 49 | Plumbing Layout and Roof Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 49): Water, sewer/vent and roof drain piping only. | not read | Open the page → |
P3.1 Copy of Drawings.pdf · page 50 | Plumbing Schematic Diagram | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 50): Domestic water and sewer/vent riser diagrams. | not read | Open the page → |
P4.1 Copy of Drawings.pdf · page 51 | Plumbing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 51): Plumbing details (vents, hose bibb, drains, cleanouts, pipe hangers). | not read | Open the page → |
P4.2 Copy of Drawings.pdf · page 52 | Plumbing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 52): Firestop, generic pipe seismic bracing and grease interceptor details for plumbing. | not read | Open the page → |
S1 Copy of Drawings.pdf · page 34 | Foundation Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 34): Foundation plan, footing schedules; structure only. | not read | Open the page → |
S2 Copy of Drawings.pdf · page 35 | Roof Framing Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 35): Roof framing plan; structure only. | not read | Open the page → |
SD0 Copy of Drawings.pdf · page 6 | Demolition Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 6): Demolition plan; RRE does not bid demolition. | not read | Open the page → |
SN2 Copy of Drawings.pdf · page 32 | Structural Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 32): Structural wood framing notes and nailing schedules. | not read | Open the page → |
SN3 Copy of Drawings.pdf · page 33 | Structural Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 33): Special inspection tables and structural observation. | not read | Open the page → |