One-line, load calc and panel schedule, all NTS. Read from the page image; feeder lengths from the one-line callouts.
Names come from: no legend on this sheet, so NECA 100-2006 is what a name rests on. It is the baseline for what a symbol MEANS, never for matching shapes — proportions differ per firm. Confirming a name here is a correction, and corrections are what build the firm's file.
Scale is UNSET. Nothing on this sheet has been measured. The reader declined to infer a scale rather than guess one, so there is no raceway and no branch wire off this sheet — together the largest block of material on a job of this kind. Set it from the title block and measurement becomes available.
Put your name in to mark this sheet up. Looking needs no name.
zoom100%sheetcounts10 of 10 marks drawn
Page 61 of Copy of Drawings.pdf, recorded by the read.
Fetching page 61…
0 changes on this sheet, each saved as it was made · ✓ confirmed by Adam Kelchlin Oct 5, 7:17 PM
History on this sheet (1)
Oct 5, 7:17 PM · Adam Kelchlin saved the sheet
Price from RRE Components2 on this sheet
Pick the RRE item for each count. The Draft Estimate opens when every sheet is answered. Put your name in above to answer these.
No RRE Components assembly is a close match. Search the catalogue for one.
Ringed yellow with “$” on the drawing.
Recommended: not in this bid — The terminations line on this takeoff already counts these circuits, and RRE’s last retail job bought no breakers for circuits in its existing panels. Recommended: Not in this bid. Where the EC furnishes new breakers, search for the breaker. One answer here prices every line in this question.
Also answers 1 line of this kind on other sheets: SWITCHBOARD AND BREAKER OPERATIONAL CHECK AND TORQUE TEST (MSB 800A AND PANEL H), BY INDEPENDENT TESTING LABORATORY
No RRE Components assembly is a close match. Search the catalogue for one.
Ringed purple with “$” on the drawing.
Recommended — RRE buys a backboard as one 4’x8’ plywood sheet at $66 and 2.3 hr (its last retail, restaurant and store jobs). Recommended: RRE-PLYWOOD, one per board drawn.
4'X8' PLYWOOD BACKBOARD (fire-rated, painted)recommendedRRE-PLYWOOD · $66.00 material · 2.30 hr each
None of these right?
Lines RRE adds for this sheet2 to answer
RRE carries these on jobs like this one, and no symbol on the drawing counts them. Add each with a count, or answer “not in this bid”. The Draft Estimate opens when every one is answered. Put your name in above to answer these.
RRE PER-JOB KIT
The allowance RRE carries on every job: 20 5/8" anchors with all-thread, nuts and washers, sealant, five screw-cover boxes, channel cuts, pull tape and a $50 device allowance.
Recommended — RRE priced this on 4 of 5 past jobs (80%). RRE carried these items at identical quantities on each of its last three jobs -- a fixed allowance, not a count (11.5 hr, $582). Recommended: RRE-HOUSE-KIT, once per job.
276 tan wire nuts, 92 insulated pigtails, 184 anti-short bushings with their screws, a 4x8 plywood backboard and 1" PVC fittings.
Recommended — RRE priced this on 4 of 5 past jobs (80%). RRE carried these at exactly these quantities on its two larger jobs (22.0 hr, $150), and about an eighth of them, with no backboard, on its smallest. Recommended: RRE-HOUSE-KIT-LOOSE on a job of restaurant or larger-retail size; leave it off a small fit-out.
eaRRE-HOUSE-KIT-LOOSE · RRE PER-JOB LOOSE PARTS (wire nuts, pigtails, bushings, backboard, PVC fittings) · 21.96 hr each
Footage3 need you · 5 read by the reader
Put your name in above to answer these.
0Is this footage right?
2" PVC SCH 40 CONDUIT UNDERGROUND - FEEDER MSB TO PANEL H
Feeder raceway MSB to panel H, 2"C
The reader measured 60 ft along the dashed path (raw, before waste); the line carries 0 ft.
ft
· Strike it: ·
0Is this footage right?
#3/0 AWG THHN/THWN-2 CU
Feeder MSB to panel H, (4)#3/0 (3 phase + full neutral)
Wire is its conduit times the conductors in it, so it is not measured on the drawing. Check the conduit line.
ft
· Strike it: ·
0Is this footage right?
#6 AWG THHN/THWN-2 CU GROUND
Feeder MSB to panel H equipment ground
Wire is its conduit times the conductors in it, so it is not measured on the drawing. Check the conduit line.
ft
· Strike it: ·
By symbol9 of 9 shown
10
all marks
hover a group to filter the plan
Counted here, not marked on the drawing
The takeoff counted these from this sheet (circuit labels, the panel schedule) without placing a mark. Marks for drawn symbols come with the symbol-counting step.