Light fixtures are carried at $0, as RRE bids them (by quote or owner-furnished): the total has their install labor and rough-in only. Enter a quote under Supplier quotes if RRE furnishes them.
On the lighting quote at $0, as RRE bids them. Bought loose instead, the power pack 120/277v-24v would come to about $64.18 at platt.com website prices (above RRE’s account pricing) -- not in the total.
What the quantities were named against. The set’s own legend (E1.0). The price is a pure function of the quantities, and the quantities rest on the engineer’s own symbol list.
Labor added for this job, at your company’s percentages. It is shown as its own labor line; no item’s own hours change. None applied.
Every percentage is 0 % until your company sets them under Settings → Company standards.
1 quoted line not yet verified against a quote (Lighting Fixtures). Approval and sign-off wait until each is ticked.
| Line | Amount | How it was worked out |
|---|---|---|
| Materials | $14,959.84 | RRE's prices, summed from the 102 component rows the assemblies expand into. |
| Labor | $12,624.47 | 307.91 hours at $ an hour. |
| Supplier quotes | $1,100.00 | 1 line. |
| $1,100.00 | $ | |
| Subcontractors | $0.00 | Nothing entered. |
| Direct job expense | $0.00 | 5 lines. |
| $0.00 | $ × qtyquantity blank: prices at $0 | |
| $0.00 | $ × qtyquantity blank: prices at $0 | |
| $0.00 | $ × qtyquantity blank: prices at $0 | |
| $0.00 | $ × qty | |
| $0.00 | $ × qty | |
| Equipment rental | $0.00 | 2 lines. |
| $0.00 | $ × days × unitsquantity blank: prices at $0 | |
| $0.00 | $ × days × unitsquantity blank: prices at $0 | |
| Raw cost | $28,684.30 | Materials + labor + quotes + subs + direct job expense + equipment. |
| Sales tax at % | $1,164.34 | Applied to materials, supplier quotes and equipment rental only — never to labor, subcontractors or direct job expense. |
| Overhead at % | $2,984.86 | On raw cost including tax. |
| Profit at % | $1,641.68 | On raw cost plus overhead, and on the tax. |
| Total bid cost PROVISIONAL | $34,475.18 | Raw cost with tax, plus overhead, plus profit. |
Priced by the deterministic engine — a pure function of quantities, the assembly library and the assumptions. No model is consulted anywhere in this screen, which is what makes the number reproducible in a dispute six months from now. Back to the review →