Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again.
Wired as: Homeruns in 3/4" EMT with #10; fixtures in MC luminary cable; device drops in MC — set by kelchlin.
The RRE item carries no price for the part named, so the estimate has the install labor and rough-in only, and the vendor or sub prices the rest. Send the lighting and gear lists from Material list & vendor quotes.
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
LIGHT FIXTURE TYPE C - EXTERIOR WALL SCONCE 55W 120V, LSI XPWS3-WT-LED-48-350-UE-PCI120 OR EQUAL Exterior W wall and S wall, circuit H-5c | LED WALL SCONCE - MED | 2 ea | E4.0 |
LIGHT FIXTURE TYPE D - WALL MOUNTED LED 16W 120V, LSI SW-2-20L-830-UNV OR EQUAL Back room at SW door, circuit H-1e | LED WALL SCONCE - MED | 1 ea | E4.0 |
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
TITLE 24 LIGHTING CONTROLS ACCEPTANCE TEST NRCA-LTI-02-A (INDOOR - OCCUPANCY SENSORS & AUTOMATIC TIME SWITCH CONTROLS, CERTIFIED ATT) Tenant space; per NRCC-LTI-E Section V, completed through an ATTCP-certified acceptance test technician | POWER PACK 120/277V-24V | 1 ea | E2.1 |
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
CIRCUIT BREAKER 200A 3P IN MSB (FEEDS PANEL H) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
PANELBOARD 225A BUS 200A 3P MAIN BREAKER 120/208V 3PH 4W 42 CKT BOLT-ON SURFACE 22KAIC Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 20A 1P 120V BOLT-ON Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 30A 3P 208V BOLT-ON Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 50A 3P 208V BOLT-ON Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 40A 2P 208V BOLT-ON Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated |
Symbols on this set. A symbol list was found on the drawings: E1.0 — ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS. The project legend is authoritative for this set and outranks everything else — NECA 100-2006 itself allows a drawing to use non-standard symbols provided the legend explains them. NECA 100-2006 stays underneath it for anything the legend leaves silent, and no conventions file exists for MATRISCOPE ENGINEERING.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
E1.1 page 54 | ELECTRICAL SITE PLAN | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E1.1 page 54 | ELECTRICAL SITE PLAN | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E2.0 page 55 | ELECTRICAL TITLE 24 INTERIOR PART 1 scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E2.0 page 55 | ELECTRICAL TITLE 24 INTERIOR PART 1 scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E2.1 page 56 | ELECTRICAL TITLE 24 INTERIOR PART 2 scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E2.1 page 56 | ELECTRICAL TITLE 24 INTERIOR PART 2 |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
Drawings p28 Copy of Drawings.pdf · page 28 | SP.5 TECHNICAL SPECIFICATIONS (M I Architects) - Sections 084113 end, 087100 Door Hardware, 088000 Glazing, 092400 Cement Plastering, 092900 Gypsum Board | Read for scope: nothing electrical on it. | nothing open | See the page → |
A1.1 Copy of Drawings.pdf · page 15 | FLOOR PLAN, NOTES & WALL TYPE LEGEND (M I Architects, 3/16"=1'-0") | Read for scope: nothing electrical on it. | nothing open | See the page → |
A1.2 Copy of Drawings.pdf · page 16 | REFLECTED CEILING PLAN, DOOR TYPES, DOOR & WINDOW SCHEDULES & NOTES | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.1 Copy of Drawings.pdf · page 18 | EXTERIOR ELEVATIONS (M I Architects, 3/16"=1'-0"): A SOUTHEAST ELEVATION (EL CAMINO AVE. COR. WILLOW ST.), B EAST ELEVATION | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.2 Copy of Drawings.pdf · page 19 | EXTERIOR ELEVATIONS (M I Architects, 3/16"=1'-0"): A NORTH ELEVATION, B WEST ELEVATION | Read for scope: nothing electrical on it. | nothing open | See the page → |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
Drawings p1 Copy of Drawings.pdf · page 1 | Cover Sheet | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 1): Cover: code analysis, general notes, scope list, sheet index, directory; no electrical work drawn. | not read | Open the page → |
Drawings p2 Copy of Drawings.pdf · page 2 | Abbreviations, Legend & Conditions of Approval | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 2): Abbreviations, symbol legend, city conditions of approval text (EV/fire alarm are only requirements, no work drawn). | not read | Open the page → |
Drawings p24 Copy of Drawings.pdf · page 24 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 24): Architectural specs (membrane curing, metal fabrications, carpentry, roofing); no Div 26-28. | not read | Open the page → |
Drawings p25 Copy of Drawings.pdf · page 25 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 25): Architectural specs (underlayment, roofing, sheet metal, sealants); no Div 26-28. | not read | Open the page → |
| Struck: not in this bid |
| E5.0 |
FUSE 60A 250V CURRENT-LIMITING CLASS RK5 Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E3.0 |
FUSE 40A 250V CURRENT-LIMITING CLASS RK5 Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
1" PVC SCH 40 CONDUIT UNDERGROUND - EV-1 FEEDER Struck by kelchlin: Not in this job (struck on drawing E5.0). | — | not stated | Struck: not in this bid | E5.0 |
1" PVC SCH 40 CONDUIT UNDERGROUND - EV-2 FEEDER Struck by kelchlin: Not in this job (struck on drawing E5.0). | — | not stated | Struck: not in this bid | E5.0 |
1" PVC SCH 40 CONDUIT UNDERGROUND - EV-3 FEEDER Struck by kelchlin: Not in this job (struck on drawing E5.0). | — | not stated | Struck: not in this bid | E5.0 |
FUSE 40A 250V CURRENT-LIMITING (CLASS RK1/J), DUAL ELEMENT Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
1" RIGID STEEL CONDUIT, PVC-COATED, EXPOSED EXTERIOR Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
5" PVC SCHEDULE 40 CONDUIT, UNDERGROUND (PG&E SECONDARY) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E1.1 |
FUSE 60A 250V CLASS RK5 DUAL-ELEMENT CURRENT-LIMITING Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E3.0 |
1" RIGID GALVANIZED STEEL CONDUIT (RGS), ROOF Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E3.0 |
WIRE, 0-10V DIMMING CONTROL PAIR 2 #16 (CLASS 1 RATED) - IN LIGHTING EMT Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E4.0 |
CIRCUIT BREAKER 200A 3P IN MSB (SERVES PANEL H) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
PANELBOARD H 120/208V 3PH 4W 225A BUS, 200A 3P MAIN BREAKER, 42 CKT, BOLT-ON, SURFACE, 22 KAIC Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 20A 1P BOLT-ON (PANEL H) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 30A 3P BOLT-ON (PANEL H, AC-1) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 50A 3P BOLT-ON (PANEL H, AC-2) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
CIRCUIT BREAKER 40A 2P BOLT-ON (PANEL H, EV-1/EV-2/EV-3 EVSE) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
2" PVC SCH 40 CONDUIT (FEEDER MSB TO PANEL H) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
#6 AWG CU THWN EQUIPMENT GROUND (FEEDER MSB TO PANEL H) Struck by kelchlin: Not in this job (struck on drawing E5.0). | — | not stated | Struck: not in this bid | E5.0 |
1" PVC SCH 40 CONDUIT (EVSE FEEDERS) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
#10 AWG CU THWN EQUIPMENT GROUND (EVSE FEEDERS) Struck by kelchlin: Not in this job (struck on drawing E5.0). | — | not stated | Struck: not in this bid | E5.0 |
#3/0 AWG BARE CU GROUNDING ELECTRODE CONDUCTOR (GEC) Struck by kelchlin: Not in this bid: answered on the drawing instead of a RRE Components item. | — | not stated | Struck: not in this bid | E5.0 |
| Read. |
| ✓ confirmed by kelchlin · Sep 30, 5:45 PM |
| Open to reopen or edit → |
E2.2 page 57 | ELECTRICAL TITLE 24 EXTERIOR PART 1 scale not set | Read. | ✓ confirmed by kelchlin · Oct 3, 7:59 PM | Open to reopen or edit → |
E2.2 page 57 | ELECTRICAL TITLE 24 EXTERIOR PART 1 scale not set | Read. | ✓ confirmed by kelchlin · Oct 3, 7:59 PM | Open to reopen or edit → |
E2.3 page 58 | ELECTRICAL TITLE 24 EXTERIOR PART 2 scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E2.3 page 58 | ELECTRICAL TITLE 24 EXTERIOR PART 2 scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 5:45 PM | Open to reopen or edit → |
E3.0 page 59 | ELECTRICAL POWER & ROOF PLAN | Read. | reopened by kelchlin · Oct 3, 8:25 PM | Read it → |
E3.0 page 59 | ELECTRICAL POWER & ROOF PLAN | Read. | reopened by kelchlin · Oct 3, 8:25 PM | Read it → |
E4.0 page 60 | ELECTRICAL LIGHTING PLAN | Read. | ✓ confirmed by kelchlin · Sep 30, 5:46 PM | Open to reopen or edit → |
E4.0 page 60 | ELECTRICAL LIGHTING PLAN | Read. | ✓ confirmed by kelchlin · Sep 30, 5:46 PM | Open to reopen or edit → |
E5.0 page 61 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:07 PM | Open to reopen or edit → |
E5.0 page 61 | ELECTRICAL SINGLE-LINE DIAGRAM, LOAD CALCULATION & PANEL SCHEDULE scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:07 PM | Open to reopen or edit → |
E6.0 page 62 | ELECTRICAL DETAILS scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:07 PM | Open to reopen or edit → |
E6.0 page 62 | ELECTRICAL DETAILS scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:07 PM | Open to reopen or edit → |
E7.0 page 63 | ELECTRICAL SPECIFICATIONS scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:08 PM | Open to reopen or edit → |
E7.0 page 63 | ELECTRICAL SPECIFICATIONS scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:08 PM | Open to reopen or edit → |
M0.2 page 40 | MECHANICAL SCHEDULES AND DETAILS scale not set | Read. | ✓ confirmed by kelchlin · Sep 30, 6:08 PM | Open to reopen or edit → |
DS1 page 36 |
STRUCTURAL FOUNDATION DETAILS (ISE Structural Engineers; det 15 MAIN SWITCHBOARD ATTACHMENT AT SLAB, rev delta 1 PC1 11/22/2023) scale not set |
| Read. |
| nothing open |
| Read it → |
E1.0 page 53 symbol list | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS scale not set | Read. | nothing open | Read it → |
E1.0 page 53 symbol list | ELECTRICAL GENERAL NOTES, LEGEND & SYMBOLS scale not set | Read. | nothing open | Read it → |
M2.1 page 44 | MECHANICAL FLOOR PLAN | Read. | nothing open | Read it → |
M2.2 Copy of Drawings.pdf · page 45 | MECHANICAL ROOF PLAN (M I Architects / MR Engineering, 3/16"=1'-0") | Read for scope: nothing electrical on it. | nothing open | See the page → |
SD1 Copy of Drawings.pdf · page 7 | SITE PLAN (M I Architects, 1"=20'-0") | Read for scope: nothing electrical on it. | nothing open | See the page → |
SD2 Copy of Drawings.pdf · page 8 | SITE DETAILS (M I Architects, proj 18-10002, rev 1 11-14-23) | Read for scope: nothing electrical on it. | nothing open | See the page → |
SD3 page 9 | SITE DETAILS (M I Architects) - Trash enclosure plan & elevations, vacuum equipment, gate, bike rack | Read. | nothing open | Read it → |
SD4 Copy of Drawings.pdf · page 10 | SITE DETAILS (SD4 - M I Architects, proj 18-10002; det 7 EV Charging Equipment Plan & Elevation(s) (For Future Use), det 17 EV Accessible Parking Stall (For Future Use), dets 8/9/14/19 stair, handrail, ramp) | Read for scope: nothing electrical on it. | nothing open | See the page → |
SN1 Copy of Drawings.pdf · page 31 | STRUCTURAL NOTES (SN1 - Structural General Notes, Innovative Structural Engineering, ISE proj 23-7640.05) | Read for scope: nothing electrical on it. | nothing open | See the page → |
Drawings p26 Copy of Drawings.pdf · page 26 |
Technical Specifications |
| Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 26): Architectural specs (roofing, flashing, sheet metal); no electrical. |
| not read |
| Open the page → |
Drawings p27 Copy of Drawings.pdf · page 27 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 27): Architectural specs (sprayed fire-resistive, joint sealants, hollow metal doors, wood doors, storefront). | not read | Open the page → |
Drawings p29 Copy of Drawings.pdf · page 29 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 29): Architectural specs (gypsum board, tile, acoustical ceilings, flooring, paint); no Div 26-28. | not read | Open the page → |
Drawings p3 Copy of Drawings.pdf · page 3 | CalGreen 2022 Notes & Non-Residential Checklist | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 3): CalGreen code checklist and notes; no electrical work drawn. | not read | Open the page → |
Drawings p30 Copy of Drawings.pdf · page 30 | Technical Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 30): Architectural specs (painting, toilet compartments/accessories); no electrical. | not read | Open the page → |
Drawings p4 Copy of Drawings.pdf · page 4 | 2022 CalGreen Non-Residential Checklist (Continued) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 4): CalGreen checklist pages only. | not read | Open the page → |
Drawings p5 Copy of Drawings.pdf · page 5 | 2022 CalGreen Non-Residential Checklist (Continued) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 5): CalGreen checklist, signature declarations and letter. | not read | Open the page → |
A1.5 Copy of Drawings.pdf · page 17 | Roof Plan & Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 17): Roofing, drains, curbs for future HVAC units; no power shown. | not read | Open the page → |
A3.1 Copy of Drawings.pdf · page 20 | Building Sections | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 20): Building sections: structure, insulation, roofing only. | not read | Open the page → |
A3.2 Copy of Drawings.pdf · page 21 | Wall Sections & Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 21): Parapet/coping, 2-hr wall section and entrance wall section; zoomed, no fixtures, devices or supports. | not read | Open the page → |
A5.1 Copy of Drawings.pdf · page 22 | Building Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 22): Accessibility symbol, tactile (non-illuminated) exit sign, storefront/threshold/wall details; no power. | not read | Open the page → |
A5.3 Copy of Drawings.pdf · page 23 | Building Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 23): Awning section/framing, roof drain, parapet caps, pilaster plans; zoomed, no fixtures or supports. | not read | Open the page → |
C1 page not recorded | Civil Title Sheet | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 11): Civil title sheet, notes, index map; no electrical work. | not read | — |
C2 page not recorded | Grading & Drainage Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 12): Civil grading; existing lights, transformer, switchgear shown as protect-in-place reference only. | not read | — |
C3 page not recorded | Utility Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 13): Civil water, sewer, fire service utilities only. | not read | — |
C4 page not recorded | Erosion Control Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 14): Erosion control BMPs only. | not read | — |
DS2 Copy of Drawings.pdf · page 37 | General Wood Framing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 37): Wood framing, shear wall and diaphragm details. | not read | Open the page → |
DS4 Copy of Drawings.pdf · page 38 | Structural Roof Framing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 38): Roof framing, parapet, awning beam, mechanical curb details. | not read | Open the page → |
M0.1 Copy of Drawings.pdf · page 39 | Mechanical Specifications, Legend and General Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 39): HVAC notes/specs and legend (duct smoke detector symbol only); no electrical scope shown. | not read | Open the page → |
M0.3 Copy of Drawings.pdf · page 41 | Mechanical T24 Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 41): Title 24 mechanical compliance forms. | not read | Open the page → |
M0.4 Copy of Drawings.pdf · page 42 | T24 Envelope Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 42): Title 24 NRCC-PRF-E performance compliance forms (energy tables only). | not read | Open the page → |
M0.5 Copy of Drawings.pdf · page 43 | T24 Envelope Forms | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 43): Title 24 envelope compliance forms and declaration statements. | not read | Open the page → |
P0.1 Copy of Drawings.pdf · page 46 | Plumbing General Notes, 2022 Cal Green, Specification, Legend and Symbols | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 46): Plumbing notes, specs, legend and drawing index only. | not read | Open the page → |
P0.2 Copy of Drawings.pdf · page 47 | Plumbing Schedules | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 47): Plumbing fixture schedule, pipe sizing, hydraulic calcs; no powered fixtures. | not read | Open the page → |
P2.0 Copy of Drawings.pdf · page 48 | Plumbing Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 48): Site water/sewer/grease interceptor piping. | not read | Open the page → |
P2.1 Copy of Drawings.pdf · page 49 | Plumbing Layout and Roof Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 49): Water, sewer/vent and roof drain piping layouts. | not read | Open the page → |
P3.1 Copy of Drawings.pdf · page 50 | Plumbing Schematic Diagram | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 50): Domestic water and sewer/vent riser diagrams. | not read | Open the page → |
P4.1 Copy of Drawings.pdf · page 51 | Plumbing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 51): Plumbing details (VTR, hose bibb, drains, cleanouts, pipe hangers). | not read | Open the page → |
P4.2 Copy of Drawings.pdf · page 52 | Plumbing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 52): Firestop, generic pipe seismic bracing and grease interceptor details (plumbing scope). | not read | Open the page → |
S1 Copy of Drawings.pdf · page 34 | Foundation Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 34): Structural foundation plan, footing schedules. | not read | Open the page → |
S2 Copy of Drawings.pdf · page 35 | Roof Framing Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 35): Structural roof framing plan. | not read | Open the page → |
SD0 Copy of Drawings.pdf · page 6 | Demolition Site Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 6): Demolition plan - RRE does not bid demolition. | not read | Open the page → |
SN2 Copy of Drawings.pdf · page 32 | Structural Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 32): Structural general notes (wood framing, nailing, anchors, reinforcing). | not read | Open the page → |
SN3 Copy of Drawings.pdf · page 33 | Structural Notes | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of Drawings.pdf, page 33): Special inspection tables and structural observation program. | not read | Open the page → |