What was received, analyzed.
0 of 6 were stated in the documents and read off them. Nothing is outstanding. Last set by kelchlin on 9/30/2026, 4:15:43 PM.
no bid invitation None of the documents is a bid invitation, so these were read from the drawings alone. Type the rest from the GC’s email, or add the invitation to the job and read them again.
| Drawing or construction set | found | 63 pages · 74 electrical sheet(s). |
| Symbol list on the drawings | found | Legend on E1.0. |
| Bid invitation or RFP | not found | Not uploaded — the bid / no-bid questions are answered by hand. |
| File | Type | Pages | Received | |
|---|---|---|---|---|
| Copy of Drawings.pdf | Drawing set | 63 | 9/30/2026 | Open → |
Every page was sorted when the set was uploaded: 11 electrical, 1 from other trades with electrical scope, 30 with no readable text for the takeoff to look at, and 21 not electrical. Only the electrical pieces are read; each skipped page is listed below with the reason.
| Sheet | Why |
|---|---|
E1.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 53 | electrical sheet |
E1.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 54 | electrical sheet |
E2.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 55 | electrical sheet |
E2.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 56 | electrical sheet |
E2.2 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 57 | electrical sheet |
E2.3 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 58 | electrical sheet |
E3.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 59 | electrical sheet |
E4.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 60 | electrical sheet |
| Engineering firm | MATRISCOPE ENGINEERING |
| Sheets read | 74 read · 15 with marks on the drawing Drawings p1, Drawings p2, Drawings p24, Drawings p25, Drawings p26, Drawings p27, Drawings p28, Drawings p29, Drawings p3, Drawings p30, Drawings p4, Drawings p5, A1.1, A1.2, A1.5, A2.1, A2.2, A3.1, A3.2, A5.1, A5.3, C1, C2, C3, C4, DS1, DS2, DS4, E1.0, E1.0, E1.1, E1.1, E2.0, E2.0, E2.1, E2.1, E2.2, E2.2, E2.3, E2.3, E3.0, E3.0, E4.0, E4.0, E5.0, E5.0, E6.0, E6.0, E7.0, E7.0, M0.1, M0.2, M0.3, M0.4, M0.5, M2.1, M2.2, P0.1, P0.2, P2.0, P2.1, P3.1, P4.1, P4.2, S1, S2, SD0, SD1, SD2, SD3, SD4, SN1, SN2, SN3 |
E5.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 61 | electrical sheet |
E6.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 62 | electrical sheet |
E7.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: RMB RC DATE: SCALE: AS SHOWN 11.30.2023 SHEET Copy of Drawings.pdf · page 63 | electrical sheet |
| Sheet | Why |
|---|---|
SN1 Copy of Drawings.pdf · page 31 | furnished-by / installed-by (1×) · low-voltage cabling / pathways (3×) · conduit / rough-in (2×) |
| Sheet | Why |
|---|---|
no sheet number Copy of Drawings.pdf · page 1 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 2 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 3 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 4 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 5 | no readable text, so the takeoff looks at the page itself |
SD0 Copy of Drawings.pdf · page 6 | no readable text, so the takeoff looks at the page itself |
SD1 Copy of Drawings.pdf · page 7 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 10 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 12 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 13 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 14 | no readable text, so the takeoff looks at the page itself |
A1.1 Copy of Drawings.pdf · page 15 | no readable text, so the takeoff looks at the page itself |
A1.2 Copy of Drawings.pdf · page 16 | no readable text, so the takeoff looks at the page itself |
A1.5 Copy of Drawings.pdf · page 17 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 18 | no readable text, so the takeoff looks at the page itself |
A2.2 Copy of Drawings.pdf · page 19 | no readable text, so the takeoff looks at the page itself |
A3.1 Copy of Drawings.pdf · page 20 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 24 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 25 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 26 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 27 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 28 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 29 | no readable text, so the takeoff looks at the page itself |
no sheet number Copy of Drawings.pdf · page 30 | no readable text, so the takeoff looks at the page itself |
M0.2 Copy of Drawings.pdf · page 40 | no readable text, so the takeoff looks at the page itself |
M0.3 Copy of Drawings.pdf · page 41 | no readable text, so the takeoff looks at the page itself |
M0.4 Copy of Drawings.pdf · page 42 | no readable text, so the takeoff looks at the page itself |
M0.5 Copy of Drawings.pdf · page 43 | no readable text, so the takeoff looks at the page itself |
M2.1 Copy of Drawings.pdf · page 44 | no readable text, so the takeoff looks at the page itself |
M2.2 Copy of Drawings.pdf · page 45 | no readable text, so the takeoff looks at the page itself |
| Sheet | Why |
|---|---|
SD2 Copy of Drawings.pdf · page 8 | nothing electrical in its title or notes |
SD3 Copy of Drawings.pdf · page 9 | nothing electrical in its title or notes |
no sheet number Copy of Drawings.pdf · page 11 | nothing electrical in its title or notes |
A3.2 Copy of Drawings.pdf · page 21 | nothing electrical in its title or notes |
A5.1 Copy of Drawings.pdf · page 22 | nothing electrical in its title or notes |
A5.3 Copy of Drawings.pdf · page 23 | nothing electrical in its title or notes |
SN2 Copy of Drawings.pdf · page 32 | nothing electrical in its title or notes |
SN3 Copy of Drawings.pdf · page 33 | nothing electrical in its title or notes |
S1 Copy of Drawings.pdf · page 34 | nothing electrical in its title or notes |
S2 Copy of Drawings.pdf · page 35 | nothing electrical in its title or notes |
DS1 Copy of Drawings.pdf · page 36 | nothing electrical in its title or notes |
DS2 Copy of Drawings.pdf · page 37 | nothing electrical in its title or notes |
DS4 Copy of Drawings.pdf · page 38 | nothing electrical in its title or notes |
M0.1 Copy of Drawings.pdf · page 39 | nothing electrical in its title or notes |
P0.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 46 | nothing electrical in its title or notes |
P0.2 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 47 | nothing electrical in its title or notes |
P2.0 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 48 | nothing electrical in its title or notes |
P2.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 49 | nothing electrical in its title or notes |
P3.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 50 | nothing electrical in its title or notes |
P4.1 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 51 | nothing electrical in its title or notes |
P4.2 — A2306-AD441 PROJECT #: DRAWN: CHECKED: LJT TP DATE: SCALE: AS SHOWN 12.04.2023 SHEET Copy of Drawings.pdf · page 52 | nothing electrical in its title or notes |