This sheet's PDF text layer uses a non-standard glyph encoding: every printable character is shifted +29 within the 33-126 ASCII range (e.g. '(;' decodes to 'EX', '$3352;,0$7(' decodes to 'APPROXIMATE'). Decoded programmatically with page.get_text('words'), then verified against a 150dpi render of the page. The only electrically-relevant symbol counted directly off the plan geometry is the 'APPROXIMATE TRENCHING LOCATION' call-out (keyed note 02-42.53, low+line voltage slab trenching) -- 2 occurrences, both rotated text call-outs with a leader to a hatched trench zone. All other electrical scope on this sheet (panel report, lighting/outlet demo, relamp/rewire, Sensormatic scribe, core-drill coordination) comes from the numbered Demolition Notes column, not from plan symbols, and so is not marked here -- see output/work/lines/A-110.json for the note-derived lines.
Names come from: no legend on this sheet, so NECA 100-2006 is what a name rests on. It is the baseline for what a symbol MEANS, never for matching shapes — proportions differ per firm. Confirming a name here is a correction, and corrections are what build the firm's file.
Scale is 3/16" = 1'-0" — 13.5 points per foot. Read off the title block, so measurement off this sheet is available. A later correction flags any measurement taken under the old scale as stale rather than silently recomputing it.
13.5 pt/ft
Put your name in to mark this sheet up. Looking needs no name.
zoom100%sheetcounts2 of 2 marks drawn
Page 18 of 000-Copy of 2498 A set 2025-0530 Revision 1.pdf, recorded by the read.
Fetching page 18…
0 changes on this sheet, each saved as it was made · not saved as reviewed yet
Price from RRE Components2 on this sheet
Pick the RRE item for each count. The Draft Estimate opens when every sheet is answered. Put your name in above to answer these.
Existing to remain — 2 lines: EXISTING ELECTRICAL PANEL FIELD-VERIFICATION / CERTIFIED REPORT · EXISTING OUTLET/SWITCH DEVICE REMOVAL OR REPLACEMENT
No RRE Components assembly is a close match. Search the catalogue for one.
Nothing to highlight: not marked on the drawing. Counted from this sheet’s labels or schedule.
Recommended: not in this bid — Existing to remain: RRE bid nothing for existing feeders and grounding kept on its last retail job. Use "Not in this bid" unless this job actually works on it. One answer here prices every line in this question.
No RRE Components assembly is a close match. Search the catalogue for one.
Nothing to highlight: not marked on the drawing. Counted from this sheet’s labels or schedule.
Recommended — RRE’s last retail job: 9 existing lights replaced at 0.5 hr each, RRE’s own item (the new fixture by quote). Recommended: EXISTING LIGHT - REPLACE.
EXISTING LIGHT - REPLACErecommendedRRE-LIGHT-REPLACE · $0.00 material · 0.50 hr each
None of these right?
By symbol1 of 1 shown
2
all marks
hover a group to filter the plan
Counted here, not marked on the drawing
The takeoff counted these from this sheet (circuit labels, the panel schedule) without placing a mark. Marks for drawn symbols come with the symbol-counting step.