Per this engineering firm's documented convention (knowledge/engineers/acies-engineering.json: 'at least one schedule renders as image on E3.0-class sheets -- OCR/visual read required'), the one-line diagram and both panel schedules on this sheet are placed raster images, not vector text -- confirmed programmatically: page.get_text() returns only the 2,937-character title block, while get_images() returns 5 embedded images covering the diagram and schedule areas. The panel/circuit data was read visually (rendered quadrant crops) and is carried narratively in run.yaml and takeoff-lines.json, but no per-cell coordinate extraction (OCR bounding boxes) was performed this run, so no individually addressable circuit marks are produced for this sheet -- only the three schedule image regions below, at their true image coordinates. This is recorded as a disclosed gap in run.yaml coverage_gaps, per contract.md: 'a sheet you read but could not mark is a gap too.'
Names come from: no legend on this sheet, so NECA 100-2006 is what a name rests on. It is the baseline for what a symbol MEANS, never for matching shapes — proportions differ per firm. Confirming a name here is a correction, and corrections are what build the firm's file.
Scale is UNSET. Nothing on this sheet has been measured. The reader declined to infer a scale rather than guess one, so there is no raceway and no branch wire off this sheet — together the largest block of material on a job of this kind. Set it from the title block and measurement becomes available.
Put your name in to mark this sheet up. Looking needs no name.
zoom100%sheetcounts0 of 0 marks drawn
Page 54 of BID SET 101045-001_2nd Submittal Set _USE - INCLUDES E SHEETS_.pdf, which is the page the reader recorded. Nothing has confirmed it against the title block. This page has not been confirmed. Check the title block against the sheet name above before marking anything up.
Fetching page 54…
0 changes on this sheet, each saved as it was made · not saved as reviewed yet
Price from RRE Components2 on this sheet
Pick the RRE item for each count. The Draft Estimate opens when every sheet is answered. Put your name in above to answer these.
No RRE Components assembly is a close match. Search the catalogue for one.
Nothing to highlight: not marked on the drawing. Counted from this sheet’s labels or schedule.
Recommended: not in this bid — RRE’s last retail job: 4 × 60A 250V HD 3PH N3R fused switches at the rooftop units, and a 30A GD N3R non-fused. This one reads 70A 3PH N1 non-fused, so the GD N1 switch.
recommended
None of these right?
Controls wiring — LUTRON CONTROLS SYSTEM - LABOR ONLY
Unsure: the only candidate, "LCP - LIGHTING CONTROL PANE", scores 0.479.
Nothing to highlight: not marked on the drawing. Counted from this sheet’s labels or schedule.
Recommended — No RRE Components item is built for control wiring; RRE carries work like this as labor hours (1 HOUR LABOR (CONTROLS), 1 hr each). Recommended: one hour for each counted -- change the quantity to the hours it takes.
1 HOUR LABOR (CONTROLS)recommendedRRE Components 31518 · $0.00 material · 1.00 hr each
LCP - LIGHTING CONTROL PANERRE Components 31562 · $2.38 material · 6.68 hr each
None of these right?
Lines RRE adds for this sheet3 to answer
RRE carries these on jobs like this one, and no symbol on the drawing counts them. Add each with a count, or answer “not in this bid”. The Draft Estimate opens when every one is answered. Put your name in above to answer these.
20A 2 WIRE TERMINATION
One termination per new or modified 20A single-pole circuit on the panel schedule.
Recommended — RRE priced this on 5 of 5 past jobs (100%). RRE’s last retail job: 47 × 20A 2-wire terminations ticked off the panel schedule (plus 20A/50A/60A 3-wire for the multi-pole circuits). RRE’s last restaurant job: 49 × 20A 1P at 0.26 hr. Recommended: RRE Components 10725, 20A 2 WIRE TERMINATION.
How to count: Count every 20A single-pole circuit on the panel schedule(s) that this job adds or changes.
RRE PER-JOB KIT
The allowance RRE carries on every job: 20 5/8" anchors with all-thread, nuts and washers, sealant, five screw-cover boxes, channel cuts, pull tape and a $50 device allowance.
Recommended — RRE priced this on 4 of 5 past jobs (80%). RRE carried these items at identical quantities on each of its last three jobs -- a fixed allowance, not a count (11.5 hr, $582). Recommended: RRE-HOUSE-KIT, once per job.
276 tan wire nuts, 92 insulated pigtails, 184 anti-short bushings with their screws, a 4x8 plywood backboard and 1" PVC fittings.
Recommended — RRE priced this on 4 of 5 past jobs (80%). RRE carried these at exactly these quantities on its two larger jobs (22.0 hr, $150), and about an eighth of them, with no backboard, on its smallest. Recommended: RRE-HOUSE-KIT-LOOSE on a job of restaurant or larger-retail size; leave it off a small fit-out.
eaRRE-HOUSE-KIT-LOOSE · RRE PER-JOB LOOSE PARTS (wire nuts, pigtails, bushings, backboard, PVC fittings) · 21.96 hr each
By symbol0 of 0 shown
0
all marks
hover a group to filter the plan
Counted here, not marked on the drawing
The takeoff counted these from this sheet (circuit labels, the panel schedule) without placing a mark. Marks for drawn symbols come with the symbol-counting step.