Bid / No-bid
decisionA quick set of criteria for the RRE team to check whether they want to bid this job or not. They come from sections 1 and 2 of the RRE Bid Intake Guideline →, which is the place to go when one of them is a judgement call.
Responsibility matrix found on G0.3 (Copy of Drawings.pdf, page 4). Read it before deciding: it says who furnishes and installs fixtures, low-voltage cable, controls and equipment, which changes what RRE is bidding. The takeoff reads it too.
Source: no bid invitation on file — answer from what you know. Intake lists what arrived.
Answers below were last saved by kelchlin on 10/3/2026, 5:56:11 PM. Changing one saves it.
No address yet, so the zone is answered by hand.
Field capacity there is limited above 5,000 sq ft.
Bids were due 5 days ago (the bid date is a default, the day the job came in; set the real one on Step 1).
The estimator’s initial sense of the rough order of magnitude dollar ($) value of the job.
No History Exists with GC
| Criterion | Verdict | What it rests on |
|---|---|---|
| Union Project? | green | Recorded as non-union. |
| Government or Public Works job? | green | Recorded as private work. |
| Inside a Served Zone? | green | Inside a zone RRE works in. |
| Prevailing Wage job? | green | Not prevailing wage. |
| Fresno area over 5,000 sq ft? | green | Not a large Fresno-area job, so the capacity limit does not apply. |
| Work Type | green | Tenant improvement — the normal focus. |
| Night or off-hours work? | green | Normal hours. |
| Bid period adequate? | consider | Short turnaround for this scope. A short period is acceptable on a simple job and a real risk on a complex one. |
| Rough Order of Magnitude Job Value | green | $50,000 – $100,000. Information only: RRE bids from about $5,000 to $2 million. |
| Preferred Client | green | Not a preferred client. |
| Job Type | green | Restaurant — one of the preferred markets the firm actively looks for, where the field experience and the estimating history are strongest. |
RRE