| # | Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|---|
| 1 | S CaptvieAire 208V pdf p3 page 3 | CaptiveAire Master Drawing 6912904 sheet 3 - Fire system information (TANK FS, hood 1), gas valve schedule, fire system parts list, typical Ansul R-102 layout scale not set | 3 open questions on the drawing. 3 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 2 | S CaptvieAire 208V pdf p11 page 11 | CaptiveAire Master Drawing 6912904 sheet 11 - Electrical package: hood control panel DCV-2111 install schematics ECP #1-1..#1-4 (fans, accessories, tank fire system) | 2 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 3 | E2.0 page 38 | ELECTRICAL LIGHTING PLAN | 7 open questions on the drawing. 7 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 4 | E2.0 page 38 | ELECTRICAL LIGHTING PLAN | 7 open questions on the drawing. 7 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 5 | E3.0 page 39 | ELECTRICAL POWER PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 6 | E3.0 page 39 | ELECTRICAL POWER PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 7 | E3.1 page 40 | ELECTRICAL ROOF PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 8 | E3.1 page 40 | ELECTRICAL ROOF PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 9 | E3.2 page 41 | IT POWER PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 10 | E3.2 page 41 | IT POWER PLAN | 1 open question on the drawing. 1 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 11 | E4.0 page 42 | ELECTRICAL ONE-LINE DIAGRAM AND DETAILS scale not set | 3 open questions on the drawing. 3 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 12 | E4.0 page 42 | ELECTRICAL ONE-LINE DIAGRAM AND DETAILS scale not set | 3 open questions on the drawing. 3 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
| 13 | M1.0 page 25 | MECHANICAL PLAN | 2 open questions on the drawing. 2 of them RRE Components picks or suggested lines; the Draft Estimate waits on them. | open | Open → |
Each page keeps its own drawing number when the package is reissued, so a later issue can be compared against this one rather than started again.
The RRE item carries no price for the part named, so the estimate has the install labor and rough-in only, and the vendor or sub prices the rest. Send the lighting and gear lists from Material list & vendor quotes.
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT Inverter #1 and #2 (restrooms) | LED EMERGENCYLIGHT DUAL | 2 ea | E2.0 |
LIGHT FIXTURE TYPE P1 - SUSPENDED CYLINDER LED DOWNLIGHT (ALPHABET BETA-3R) P1 pendant cylinders, dining room and corridor, circuit A-1,a | LED PENDANT MOUNTED LA | 33 ea | E2.0 |
LIGHT FIXTURE TYPE P1E - SUSPENDED CYLINDER LED DOWNLIGHT W/ REMOTE EMERGENCY BATTERY (ALPHABET BETA-3R) P1E hatched symbols, dining/corridor, A-1,a | LED EMERGENCYLIGHT DUAL | 22 ea | E2.0 |
LIGHT FIXTURE TYPE R1E - 6" ROUND RECESSED LED DOWNLIGHT W/ REMOTE EMERGENCY BATTERY (ALPHABET NBU4) R1E, BOH, A-3,h | LED EMERGENCYLIGHT DUAL | 5 ea | E2.0 |
LIGHT FIXTURE TYPE YP1 - DECORATIVE RLM PENDANT W/ GUARD (BARN LIGHT) YP1 pendants, A-33,b | LED PENDANT MOUNTED LA | 8 ea | E2.0 |
Symbols on this set. A symbol list was found on the drawings: 004-Copy-of-S_CaptvieAire-208V_pdf-p4 — CaptiveAire Master Drawing 6912904 sheet 4 - Hood #1 (5430ND-2) fire system: TANK-SP-2 fire cabinet piping plan/elevation, fire cabinet legend, section view with recessed LED hood lights, 2" 120VAC electric gas valve & strainer schedule, CAS installation includes/excludes, E1.0 — ELECTRICAL LEGEND AND DETAILS. The project legend is authoritative for this set and outranks everything else — NECA 100-2006 itself allows a drawing to use non-standard symbols provided the legend explains them. NECA 100-2006 stays underneath it for anything the legend leaves silent, and no conventions file exists for the engineering firm.
None yet.
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
S CaptvieAire 208V pdf p12 page 12 | CaptiveAire 6912904 Master Drawing sheet 12 - ECP #1-5..#1-8 factory wiring schematics (tank protection LV figures, DCV control, VFDs SM-1/SM-2, CORE fire protection) scale not set | Read. | nothing open | Read it → |
S CaptvieAire 208V pdf p13 page 13 | CaptiveAire Master Drawing 6912904 sheet 13 - DCV hood control panel specifications, sequence of operations, typical hood control panel installation, HMI detail, duct thermistor sensor installation, room override thermostat, SDV scale not set | Read. | nothing open | Read it → |
S CaptvieAire 208V pdf p2 Copy of S_CaptvieAire 208V_pdf.pdf · page 2 | CaptiveAire Master Drawing 6912904 sheet 2 - Hood hanging hardware detail, clearance to combustibles, section views Hood #1 (5430ND-2) and Hood #2 (5430VHB-ND), field wrapper detail | Read for scope: nothing electrical on it. | nothing open | See the page → |
S CaptvieAire 208V pdf p4 page 4 symbol list | CaptiveAire Master Drawing 6912904 sheet 4 - Hood #1 (5430ND-2) fire system: TANK-SP-2 fire cabinet piping plan/elevation, fire cabinet legend, section view with recessed LED hood lights, 2" 120VAC electric gas valve & strainer schedule, CAS installation includes/excludes scale not set | Read. |
| Drawing | Title | What is waiting | Review | |
|---|---|---|---|---|
CM Corp Exhibit A p1 Copy of CM Corp - Exhibit A - Subcontract Agreement_pdf.pdf · page 1 | CM Corp Exhibit A - Subcontract Agreement | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (000-Copy of CM Corp - Exhibit A - Subcontract Agreement_pdf.pdf, page 1): Blank subcontract agreement form; contract text, no scope or drawings. | not read | Open the page → |
CM Corp Master Agreement p1 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 1 | CM Corp Master Agreement p.1 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 1): Contract terms (parties, Articles 1-4); no electrical scope. | not read | Open the page → |
CM Corp Master Agreement p2 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 2 | CM Corp Master Agreement p.2 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 2): Contract terms (submittals, permits, safety, cleanup, warranty). | not read | Open the page → |
CM Corp Master Agreement p3 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 3 | CM Corp Master Agreement p.3 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 3): Contract terms (changes, disputes, termination). |
LIGHT FIXTURE TYPE YP2 - 66" I-BEAM LINEAR PENDANT (BASILE STUDIO) YP2 over communal table, A-33,c, one 66in fixture, in feet |
| LED PENDANT MOUNTED LA |
| 5.5 ft |
| E2.0 |
TRACK HEAD TYPE T3 - TRACK ACCENT (LUMENTURE T65) T3 heads on the two short TR runs | LED TRACK SPOT FIXTURE | 6 ea | E2.0 |
TRACK HEAD TYPE T1 - TRACK WALL WASH (LUMENTURE TWW160) T1 heads on banquette TR run | LED TRACK SPOT FIXTURE | 5 ea | E2.0 |
LIGHT FIXTURE TYPE X - LED EXIT SIGN W/ BATTERY (LITHONIA LHQM) Exit signs tagged X A-3 | LED GRN EXIT FIXTURE | 7 ea | E2.0 |
| Line | Needs a price for | Count | Sheet |
|---|---|---|---|
PANELBOARD 400A MCB 208Y/120V 3PH 4W 42-CKT NEMA 1 SURFACE, 10kAIC Panel L (new), BOH | 400/42 120/208V PNL 3PH | 1 ea | E4.0 |
PANELBOARD 225A MLO 208Y/120V 3PH 4W 60-CKT NEMA 1 SURFACE, 10kAIC Panel A (new), BOH | 225/36 120/208V PNL 3PH | 1 ea | E4.0 |
PANELBOARD 225A MLO 208Y/120V 3PH 4W 30-CKT NEMA 1 SURFACE, 10kAIC Panel B (new), BOH | 225/36 120/208V PNL 3PH | 1 ea | E4.0 |
Read off the schedules and notes. RRE buys none of the material named here. Check each against the responsibility matrix on the proposal: these are what it should say is by others.
| Line | Furnished by | Installed by | RRE’s part | Sheet |
|---|---|---|---|---|
3/4" EMT CONDUIT STUB TO ACCESSIBLE CEILING (low-voltage rough-in, empty w/ pull string) RRE carries the line; the read says “wiring by others”. | Others | not stated | RRE carries it; a part is by others | E3.2 |
CAMERA BACKBOX 4" SQ (rough-in only, camera + cable by others) The drawings say “by others”. | Others | Others | Not RRE’s: furnished and installed by others | E3.2 |
SPEAKER BACKBOX 4" SQ (rough-in only, speaker + cable by others) The drawings say “by others”. | Others | Others | Not RRE’s: furnished and installed by others | E3.2 |
FEEDER TERMINATION 400A 3PH 4W, (4)500 KCMIL + #3G The drawings say “landlord-furnished”. | Landlord | not stated | RRE installs / connects only | E4.0 |
ELECTRIC GAS SHUTOFF VALVE 2" (CAPTIVEAIRE 'SC ELECTRICAL', FURNISHED BY CAPTIVEAIRE, SET BY PLUMBER) - EC 120V CONNECTION + FLEX WHIP FROM HOOD CONTROL PANEL The drawings say “furnished by captiveaire”. | CAPTIVEAIRE | not stated | RRE installs / connects only | 004-Copy-of-S_CaptvieAire-208V_pdf-p3 |
| nothing open |
| Read it → |
S CaptvieAire 208V pdf p5 Copy of S_CaptvieAire 208V_pdf.pdf · page 5 | CaptiveAire Master Drawing 6912904 sheet 5 - Exhaust fan information, MUA fan information, gas fired MUA, fan options/accessories, curb assemblies, sound data, HMI schedule | Read for scope: nothing electrical on it. | nothing open | See the page → |
S CaptvieAire 208V pdf p6 Copy of S_CaptvieAire 208V_pdf.pdf · page 6 | CaptiveAire Master Drawing 6912904 sheet 6 - Fan #1 DU180HFA exhaust fan cut sheet (elevation, top view, vented roof curb, features/options) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S CaptvieAire 208V pdf p7 Copy of S_CaptvieAire 208V_pdf.pdf · page 7 | CaptiveAire Master Drawing 6912904 sheet 7 - Fan #2 DU85HFA exhaust fan cut sheet (elevation, top view, features, options), vented roof curb w/ hinge kit, direct fired (DF) profile plate assembly specifications | Read for scope: nothing electrical on it. | nothing open | See the page → |
S CaptvieAire 208V pdf p9 Copy of S_CaptvieAire 208V_pdf.pdf · page 9 | CaptiveAire Master Drawing 6912904 sheet 9 - Fan #3 A2-D.500-20D direct gas fired make-up air unit (plan, elevation, end view, 20" equipment curb), options list | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 1 p3 Copy of S_Daikin RTU-1_pdf.pdf · page 3 | RTU-1 Technical Data Sheet (p.3) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 1 p4 Copy of S_Daikin RTU-1_pdf.pdf · page 4 | RTU-1 Technical Data Sheet (p.4) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 1 p5 Copy of S_Daikin RTU-1_pdf.pdf · page 5 | RTU-1 Technical Data Sheet (p.5) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 1 p8 Copy of S_Daikin RTU-1_pdf.pdf · page 8 | RTU-1 Rebel Drawings (isometric), Daikin DPSH10B | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 1 p9 Copy of S_Daikin RTU-1_pdf.pdf · page 9 | RTU-1 Rebel Drawings - Plan View Openings & Overall | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p4 Copy of S_Daikin RTU-2_pdf.pdf · page 4 | Daikin DHH3 nomenclature / stocking models (p.4) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p54 Copy of S_Daikin RTU-2_pdf.pdf · page 54 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH036) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p6 Copy of S_Daikin RTU-2_pdf.pdf · page 6 | Daikin brochure - Features and Benefits (p.6) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p63 Copy of S_Daikin RTU-2_pdf.pdf · page 63 | Wire Diagram - 3 Ton 1-Phase HP (Power and Controls Wiring Diagram, DHH036, 1 Phase, Direct Drive, 0140L07584-A) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p64 Copy of S_Daikin RTU-2_pdf.pdf · page 64 | Wire Diagram - 3 Ton 3-Phase HP 230V (Power and Controls Wiring Diagram, DHH036, 3 Phase, Direct Drive, 0140L07585-A) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p66 Copy of S_Daikin RTU-2_pdf.pdf · page 66 | Wire Diagram - 3 Ton High Static 3-Phase HP 230/460/575V (Power and Controls Wiring Diagram, DHH036, 3 Phase, Direct Drive, High Static, 0140L07587-A) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p76 Copy of S_Daikin RTU-2_pdf.pdf · page 76 | Daikin DHH3 Electrical Connections / Unit Clearances (p.76) | Read for scope: nothing electrical on it. | nothing open | See the page → |
S Daikin RTU 2 p9 Copy of S_Daikin RTU-2_pdf.pdf · page 9 | Daikin DHH3 Product Specifications - DHH036 | Read for scope: nothing electrical on it. | nothing open | See the page → |
rocklinelectric.net Mail CM CORP p2 rocklinelectric.net Mail - CM CORP_ The Melt- Stanford, CA- Answered RFI_s.pdf · page 2 | CM Corp email - The Melt Stanford, Answered RFIs (p.2): bid invitation, 16050 Electrical | Read for scope: nothing electrical on it. | nothing open | See the page → |
A1.0 Copy of Drawings.pdf · page 10 | Floor Plan (Dimensioned Floor Plan 1/A1.0, 1/4"=1'-0") | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.0 Copy of Drawings.pdf · page 12 | Equipment Plan | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.1 Copy of Drawings.pdf · page 14 | EQUIPMENT SCHEDULE | Read for scope: nothing electrical on it. | nothing open | See the page → |
A2.1-003-Copy-of-Drawings-p14 page 14 | EQUIPMENT SCHEDULE (A2.1) scale not set | Read. | nothing open | Read it → |
A3.0 Copy of Drawings.pdf · page 15 | ROOF PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
A4.0 Copy of Drawings.pdf · page 16 | Restroom Plan and Details | Read for scope: nothing electrical on it. | nothing open | See the page → |
A6.1 Copy of Drawings.pdf · page 18 | Door and Hardware Schedule | Read for scope: nothing electrical on it. | nothing open | See the page → |
A7.0 Copy of Drawings.pdf · page 19 | REFLECTIVE CEILING PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
A7.0 Copy of Drawings.pdf · page 19 | REFLECTIVE CEILING PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
A8.1 page 21 | DETAILS scale not set | Read. | nothing open | Read it → |
A8.2 Copy of Drawings.pdf · page 22 | DETAILS | Read for scope: nothing electrical on it. | nothing open | See the page → |
ADA1.0 Copy of Drawings.pdf · page 9 | Accessibility Requirements | Read for scope: nothing electrical on it. | nothing open | See the page → |
E1.0 page 36 symbol list | ELECTRICAL LEGEND AND DETAILS scale not set | Read. | nothing open | Read it → |
E1.0 page 36 symbol list | ELECTRICAL LEGEND AND DETAILS scale not set | Read. | nothing open | Read it → |
E1.1 page 37 | ELECTRICAL IT SCHEDULE scale not set | Read. | nothing open | Read it → |
E1.1 page 37 | ELECTRICAL IT SCHEDULE scale not set | Read. | nothing open | Read it → |
E5.0 page 43 | ELECTRICAL TITLE 24 scale not set | Read. | nothing open | Read it → |
E5.0 page 43 | ELECTRICAL TITLE 24 scale not set | Read. | nothing open | Read it → |
E5.1 page 44 | ELECTRICAL TITLE 24 scale not set | Read. | nothing open | Read it → |
E5.1 page 44 | ELECTRICAL TITLE 24 scale not set | Read. | nothing open | Read it → |
E6.0 page 45 | ELECTRICAL SPECIFICATIONS scale not set | Read. | nothing open | Read it → |
E6.0 page 45 | ELECTRICAL SPECIFICATIONS scale not set | Read. | nothing open | Read it → |
G0.1 Copy of Drawings.pdf · page 2 | Code Data and Life Safety Plan | Read for scope: nothing electrical on it. | nothing open | See the page → |
G0.2 Copy of Drawings.pdf · page 3 | Abbreviations and General Symbols | Read for scope: nothing electrical on it. | nothing open | See the page → |
G0.3 Copy of Drawings.pdf · page 4 | RESPONSIBILITY MATRIX | Read for scope: nothing electrical on it. | nothing open | See the page → |
J10 Copy of S_CaptvieAire 208V_pdf.pdf · page 10 | CaptiveAire Master Drawing 6912904 sheet 10 - Exhaust fan wiring EXH6912904-1 (DU180HFA) and EXH6912904-2 (DU85HFA), MUA wiring HW6912904-3 (A2-D.500-20D), evaporative cooler wiring IBTEC6912904-3, installation wiring RP6912904-3, HMI schedule | Read for scope: nothing electrical on it. | nothing open | See the page → |
M0.1 Copy of Drawings.pdf · page 23 | Mechanical Legend and Notes | Read for scope: 1 line taken off. | nothing open | See the page → |
M0.2 Copy of Drawings.pdf · page 24 | Mechanical Specifications | Read for scope: 2 lines taken off. | nothing open | See the page → |
M1.1 Copy of Drawings.pdf · page 26 | MECHANICAL ROOF PLAN | Read for scope: nothing electrical on it. | nothing open | See the page → |
M3.0 Copy of Drawings.pdf · page 28 | MECHANICAL SCHEDULES | Read for scope: nothing electrical on it. | nothing open | See the page → |
M5.0 Copy of Drawings.pdf · page 31 | CAPTIVE AIRE - kitchen hood shop drawings (CaptiveAire job 6912904 master drawing sheets 1-4 reprinted: hood information, hood sections/hanging, fire system information and parts list, typical Ansul R-102 layout, gas valve sizing) | Read for scope: nothing electrical on it. | nothing open | See the page → |
M5.1 page 32 | CAPTIVE AIRE | Read. | nothing open | Read it → |
M5.2 Copy of Drawings.pdf · page 33 | CAPTIVE AIRE - CaptiveAire job 6912904 master drawing sheets 9-12 reprinted: sheet 9 MUA fan #3 A2-D.500-20D (options list, dimensions, curb); sheet 10 exhaust fan wiring EXH-1/EXH-2, MUA board wiring, evaporative cooler wiring, installation wiring; sheet 11 electrical package DCV-2111 ECP #1-1/#1-2 install schematics; sheet 12 tank protection electrical / low-voltage details and CORE fire system figures | Read for scope: nothing electrical on it. | nothing open | See the page → |
M5.3 Copy of Drawings.pdf · page 34 | CAPTIVE AIRE - reprint of CaptiveAire master drawing 6912904 sheets 13-16: DCV hood control panel specifications, sequence of operations, typical hood control panel installation, HMI detail, duct thermistor sensor installation, room override thermostat, SDV, Title 24 badge; ductwork #1 (double wall) and #2 (single wall) parts lists, support spacing, side/top/SE/front views | Read for scope: nothing electrical on it. | nothing open | See the page → |
UL-103 page 1 | CaptiveAire Master Drawing 6912904 sheet 1 - Hood information (Hood #1 5430ND-2 9'-5", Hood #2 5430VHB-ND 5'-0"), filters/lights/utility cabinet/fire system/electrical schedule, hood plan views, hanging detail, grease duct spec scale not set | Read. | nothing open | Read it → |
| not read |
| Open the page → |
CM Corp Master Agreement p4 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 4 | CM Corp Master Agreement p.4 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 4): Contract terms (scope reference, schedule, payment). | not read | Open the page → |
CM Corp Master Agreement p5 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 5 | CM Corp Master Agreement p.5 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 5): Contract terms (payment, final payment, insurance). | not read | Open the page → |
CM Corp Master Agreement p6 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 6 | CM Corp Master Agreement p.6 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 6): Contract terms (insurance, retention, billing procedures). | not read | Open the page → |
CM Corp Master Agreement p7 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 7 | CM Corp Master Agreement p.7 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 7): Contract signature page / non-compete clause. | not read | Open the page → |
CM Corp Master Agreement p8 Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf · page 8 | CM Corp Exhibit C - Subcontractor Operating Protocol | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (001-Copy of CM Corp - Master Agreement (MSA) & Exhibit C_pdf.pdf, page 8): Jobsite conduct protocol; no scope or responsibility matrix. | not read | Open the page → |
CM Corp Subcontractor Insurance p1 Copy of CM Corp - Subcontractor Insurance Requirements_Updated 9_22_2023_pdf.pdf · page 1 | CM Corp Insurance Requirements for Sub-Contractors | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (002-Copy of CM Corp - Subcontractor Insurance Requirements_Updated 9_22_2023_pdf.pdf, page 1): Insurance requirements only. | not read | Open the page → |
S CaptvieAire 208V pdf p14 Copy of S_CaptvieAire 208V_pdf.pdf · page 14 | Captive Aire ductwork #1 parts | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 14): Duct parts list, support spacing, duct front view. | not read | Open the page → |
S CaptvieAire 208V pdf p15 Copy of S_CaptvieAire 208V_pdf.pdf · page 15 | Captive Aire ductwork #1 views | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 15): Duct side/top/SE views. | not read | Open the page → |
S CaptvieAire 208V pdf p16 Copy of S_CaptvieAire 208V_pdf.pdf · page 16 | Captive Aire ductwork #2 parts | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 16): Duct parts list, support spacing, duct front view. | not read | Open the page → |
S CaptvieAire 208V pdf p17 Copy of S_CaptvieAire 208V_pdf.pdf · page 17 | CaptiveAire Ductwork #2 Side / Top / SE View | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 17): Grease exhaust duct riser views only; no electrical. | not read | Open the page → |
S CaptvieAire 208V pdf p18 Copy of S_CaptvieAire 208V_pdf.pdf · page 18 | CaptiveAire DW-2R Double Wall Grease Duct Specification / Riser Cover | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 18): Grease duct spec, clearances and riser details; no electrical. | not read | Open the page → |
S CaptvieAire 208V pdf p8 Copy of S_CaptvieAire 208V_pdf.pdf · page 8 | Captive Aire grease duct / grease box installation | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (004-Copy of S_CaptvieAire 208V_pdf.pdf, page 8): Grease duct spec, curb termination and grease box install steps. | not read | Open the page → |
S Daikin RTU 1 p1 Copy of S_Daikin RTU-1_pdf.pdf · page 1 | Daikin Submittal Data cover - The Melt Davis CA | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 1): Submittal cover page. | not read | Open the page → |
S Daikin RTU 1 p10 Copy of S_Daikin RTU-1_pdf.pdf · page 10 | RTU-1 Plan View - CG, Corner Weights, Service Clearance | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 10): Service clearances and component layout; no electrical work. | not read | Open the page → |
S Daikin RTU 1 p11 Copy of S_Daikin RTU-1_pdf.pdf · page 11 | RTU-1 Curb View | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 11): Curb supply/return opening dimensions. | not read | Open the page → |
S Daikin RTU 1 p2 Copy of S_Daikin RTU-1_pdf.pdf · page 2 | Daikin Submittal Table of Contents | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 2): Table of contents only. | not read | Open the page → |
S Daikin RTU 1 p6 Copy of S_Daikin RTU-1_pdf.pdf · page 6 | RTU-1 Technical Data Sheet (p.6) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 6): Factory sensors, warranty, space sensor/roof curb accessories (controls/mechanical). | not read | Open the page → |
S Daikin RTU 1 p7 Copy of S_Daikin RTU-1_pdf.pdf · page 7 | RTU-1 Fan Curve - Supply | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (005-Copy of S_Daikin RTU-1_pdf.pdf, page 7): Fan selection curve only. | not read | Open the page → |
S Daikin RTU 2 p1 Copy of S_Daikin RTU-2_pdf.pdf · page 1 | Daikin DHH Commercial brochure cover (SS-DHH3-R32) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 1): Product brochure cover. | not read | Open the page → |
S Daikin RTU 2 p10 Copy of S_Daikin RTU-2_pdf.pdf · page 10 | Daikin DHH3 Product Specifications - DHH048 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 10): Spec table for non-selected 4-ton sizes; nothing highlighted, no electrical scope for this unit. | not read | Open the page → |
S Daikin RTU 2 p11 Copy of S_Daikin RTU-2_pdf.pdf · page 11 | Daikin DHH3 Product Specifications - DHH060 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 11): Spec table for non-selected 5-ton sizes; nothing highlighted. | not read | Open the page → |
S Daikin RTU 2 p12 Copy of S_Daikin RTU-2_pdf.pdf · page 12 | Daikin DHH3 Product Specifications - DHH072 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 12): Spec table for non-selected 6-ton sizes; nothing highlighted. | not read | Open the page → |
S Daikin RTU 2 p13 Copy of S_Daikin RTU-2_pdf.pdf · page 13 | Daikin DHH3 AHRI Ratings / Coil Dimensions / Sound Data | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 13): Manufacturer performance and sound tables, mechanical only. | not read | Open the page → |
S Daikin RTU 2 p14 Copy of S_Daikin RTU-2_pdf.pdf · page 14 | Daikin DHH3 Dimensional Data 3-6 Tons | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 14): Unit dimensions, duct openings and thru-base utility knockouts; mechanical cut sheet, no EC scope shown. | not read | Open the page → |
S Daikin RTU 2 p16 Copy of S_Daikin RTU-2_pdf.pdf · page 16 | Daikin DHH3 Expanded Cooling Data - DHH036 (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 16): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p17 Copy of S_Daikin RTU-2_pdf.pdf · page 17 | Daikin DHH3 Expanded Cooling Data - DHH036 70% | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 17): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p18 Copy of S_Daikin RTU-2_pdf.pdf · page 18 | Daikin DHH3 Expanded Cooling Data - DHH036 70% (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 18): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p2 Copy of S_Daikin RTU-2_pdf.pdf · page 2 | Daikin brochure - Our Perfect Package | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 2): Marketing text. | not read | Open the page → |
S Daikin RTU 2 p20 Copy of S_Daikin RTU-2_pdf.pdf · page 20 | Daikin DHH3 Expanded Cooling Data - DHH048 (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 20): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p21 Copy of S_Daikin RTU-2_pdf.pdf · page 21 | Daikin DHH3 Expanded Cooling Data - DHH048 70% | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 21): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p22 Copy of S_Daikin RTU-2_pdf.pdf · page 22 | Daikin DHH3 Expanded Cooling Data - DHH048 70% (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 22): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p24 Copy of S_Daikin RTU-2_pdf.pdf · page 24 | Daikin DHH3 Expanded Cooling Data - DHH060 (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 24): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p25 Copy of S_Daikin RTU-2_pdf.pdf · page 25 | Daikin DHH3 Expanded Cooling Data - DHH060 70% | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 25): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p26 Copy of S_Daikin RTU-2_pdf.pdf · page 26 | Daikin DHH3 Expanded Cooling Data - DHH060 70% (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 26): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p28 Copy of S_Daikin RTU-2_pdf.pdf · page 28 | Daikin DHH3 Expanded Cooling Data - DHH072 (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 28): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
S Daikin RTU 2 p29 Copy of S_Daikin RTU-2_pdf.pdf · page 29 | Electrical Heater Data - DHH072 70% (cooling performance table) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 29): Daikin RTU submittal: cooling capacity/pressure/amps performance table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p3 Copy of S_Daikin RTU-2_pdf.pdf · page 3 | Daikin brochure - Contents | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 3): Table of contents. | not read | Open the page → |
S Daikin RTU 2 p30 Copy of S_Daikin RTU-2_pdf.pdf · page 30 | Electrical Heater Data - DHH072 70% (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 30): Daikin RTU submittal: cooling performance table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p31 Copy of S_Daikin RTU-2_pdf.pdf · page 31 | Electrical Heater Data - Air Flow for Electric Heat / Heater Kit Nomenclature | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 31): Daikin submittal: heater kit kW/CFM and model nomenclature (voltage codes); no MCA/MOCP, circuits or devices. | not read | Open the page → |
S Daikin RTU 2 p32 Copy of S_Daikin RTU-2_pdf.pdf · page 32 | Airflow - 3 Ton Standard Static | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 32): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p33 Copy of S_Daikin RTU-2_pdf.pdf · page 33 | Airflow - 3-4 Ton Standard Static | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 33): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p34 Copy of S_Daikin RTU-2_pdf.pdf · page 34 | Airflow - 5 Ton Standard Static | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 34): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p35 Copy of S_Daikin RTU-2_pdf.pdf · page 35 | Airflow - 6 Ton Standard Static | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 35): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p36 Copy of S_Daikin RTU-2_pdf.pdf · page 36 | Airflow - 3 Ton High-Static Drive | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 36): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p37 Copy of S_Daikin RTU-2_pdf.pdf · page 37 | Airflow - 3 Ton High-Static Drive (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 37): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p38 Copy of S_Daikin RTU-2_pdf.pdf · page 38 | Airflow - 4 Ton High-Static Drive | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 38): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p39 Copy of S_Daikin RTU-2_pdf.pdf · page 39 | Airflow - 4 Ton High-Static Drive (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 39): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p40 Copy of S_Daikin RTU-2_pdf.pdf · page 40 | Airflow - 5 Ton High-Static Drive | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 40): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p41 Copy of S_Daikin RTU-2_pdf.pdf · page 41 | Airflow - 5 Ton High-Static Drive (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 41): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p42 Copy of S_Daikin RTU-2_pdf.pdf · page 42 | Airflow - 6 Ton High-Static Drive | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 42): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p43 Copy of S_Daikin RTU-2_pdf.pdf · page 43 | Airflow - 6 Ton High-Static Drive (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 43): Daikin RTU submittal: blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p44 Copy of S_Daikin RTU-2_pdf.pdf · page 44 | DDC Airflow - 3 Ton | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 44): Daikin RTU submittal: DDC blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p45 Copy of S_Daikin RTU-2_pdf.pdf · page 45 | DDC Airflow - 4 Ton | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 45): Daikin RTU submittal: DDC blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p46 Copy of S_Daikin RTU-2_pdf.pdf · page 46 | DDC Airflow - 4 Ton (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 46): Daikin RTU submittal: DDC blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p47 Copy of S_Daikin RTU-2_pdf.pdf · page 47 | DDC Airflow - 5 Ton | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 47): Daikin RTU submittal: DDC blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p48 Copy of S_Daikin RTU-2_pdf.pdf · page 48 | DDC Airflow - 5 Ton (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 48): Daikin RTU submittal: DDC blower airflow table; no EC scope. | not read | Open the page → |
S Daikin RTU 2 p49 Copy of S_Daikin RTU-2_pdf.pdf · page 49 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - DDC Airflow 6 Ton | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 49): RTU fan airflow/RPM tables; mechanical only. | not read | Open the page → |
S Daikin RTU 2 p5 Copy of S_Daikin RTU-2_pdf.pdf · page 5 | Daikin brochure - Features and Benefits (p.5) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 5): Cabinet/compressor/fan/coil features; generic mention of electrical knockouts. | not read | Open the page → |
S Daikin RTU 2 p50 Copy of S_Daikin RTU-2_pdf.pdf · page 50 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - DDC Airflow 6 Ton (cont.) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 50): RTU fan airflow tables; mechanical only. | not read | Open the page → |
S Daikin RTU 2 p51 Copy of S_Daikin RTU-2_pdf.pdf · page 51 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Heating Data Tables (DHH036/048) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 51): heat pump capacity tables; no EC work. | not read | Open the page → |
S Daikin RTU 2 p52 Copy of S_Daikin RTU-2_pdf.pdf · page 52 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Heating Data Tables (DHH060/072) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 52): heat pump capacity tables; no EC work. | not read | Open the page → |
S Daikin RTU 2 p53 Copy of S_Daikin RTU-2_pdf.pdf · page 53 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Static Pressure | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 53): economizer pressure-drop tables; mechanical only. | not read | Open the page → |
S Daikin RTU 2 p55 Copy of S_Daikin RTU-2_pdf.pdf · page 55 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH036W/0367/0481) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 55): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p56 Copy of S_Daikin RTU-2_pdf.pdf · page 56 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0483/0484) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 56): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p57 Copy of S_Daikin RTU-2_pdf.pdf · page 57 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0484W/0487) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 57): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p58 Copy of S_Daikin RTU-2_pdf.pdf · page 58 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH060) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 58): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p59 Copy of S_Daikin RTU-2_pdf.pdf · page 59 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0604/0607) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 59): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p60 Copy of S_Daikin RTU-2_pdf.pdf · page 60 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0607W/0723) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 60): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p61 Copy of S_Daikin RTU-2_pdf.pdf · page 61 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0724/0727) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 61): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p62 Copy of S_Daikin RTU-2_pdf.pdf · page 62 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Electrical Data (DHH0727W) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 62): electrical tables for non-selected models only. | not read | Open the page → |
S Daikin RTU 2 p65 Copy of S_Daikin RTU-2_pdf.pdf · page 65 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 3 Ton 3-Phase HP 460/575V | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 65): factory wiring diagram for a voltage not selected (unit is 208/230/3). | not read | Open the page → |
S Daikin RTU 2 p67 Copy of S_Daikin RTU-2_pdf.pdf · page 67 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 4-5 Ton 1-Phase HP | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 67): factory wiring diagram for non-selected size. | not read | Open the page → |
S Daikin RTU 2 p68 Copy of S_Daikin RTU-2_pdf.pdf · page 68 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 4-5 Ton 3-Phase 230V HP | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 68): factory wiring diagram for non-selected size. | not read | Open the page → |
S Daikin RTU 2 p69 Copy of S_Daikin RTU-2_pdf.pdf · page 69 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 4-5 Ton 3-Phase 460V HP | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 69): factory wiring diagram for non-selected size. | not read | Open the page → |
S Daikin RTU 2 p7 Copy of S_Daikin RTU-2_pdf.pdf · page 7 | Daikin brochure - product photo | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 7): Photo page only. | not read | Open the page → |
S Daikin RTU 2 p70 Copy of S_Daikin RTU-2_pdf.pdf · page 70 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 4-5 Ton 3-Phase 575V HP | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 70): factory wiring diagram for non-selected size. | not read | Open the page → |
S Daikin RTU 2 p71 Copy of S_Daikin RTU-2_pdf.pdf · page 71 | Daikin DHH3 RTU submittal (SS-DHH3-R32) - Wire Diagram 4-5 Ton High Static 3-Phase 230V HP | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 71): factory wiring diagram for non-selected size. | not read | Open the page → |
S Daikin RTU 2 p72 Copy of S_Daikin RTU-2_pdf.pdf · page 72 | Daikin DHH3 Wire Diagram - 4-5 Ton High Static 3-Phase 460V HP (p.72) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 72): Manufacturer factory wiring diagram for a non-selected size (RTU-2 is DHH036); internal unit wiring, no EC scope. | not read | Open the page → |
S Daikin RTU 2 p73 Copy of S_Daikin RTU-2_pdf.pdf · page 73 | Daikin DHH3 Wire Diagram - 4-5 Ton High Static 3-Phase 575V HP (p.73) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 73): Manufacturer factory wiring diagram for a non-selected size (RTU-2 is DHH036); internal unit wiring, no EC scope. | not read | Open the page → |
S Daikin RTU 2 p74 Copy of S_Daikin RTU-2_pdf.pdf · page 74 | Daikin DHH3 Wire Diagram - 6 Ton 3-Phase 230/460/575V HP (p.74) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 74): Manufacturer factory wiring diagram for a non-selected size (RTU-2 is DHH036); internal unit wiring, no EC scope. | not read | Open the page → |
S Daikin RTU 2 p75 Copy of S_Daikin RTU-2_pdf.pdf · page 75 | Daikin DHH3 Wire Diagram - 6 Ton High Static 3-Phase 230/460/575V HP (p.75) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 75): Manufacturer factory wiring diagram for a non-selected size (RTU-2 is DHH036); internal unit wiring, no EC scope. | not read | Open the page → |
S Daikin RTU 2 p77 Copy of S_Daikin RTU-2_pdf.pdf · page 77 | Daikin DHH3 Installation - Unit Location, Roof Curb, Weights (p.77) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 77): Rigging, roof curb installation and corner weights; mechanical/structural only. | not read | Open the page → |
S Daikin RTU 2 p78 Copy of S_Daikin RTU-2_pdf.pdf · page 78 | Daikin brochure - Notes (p.78) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 78): Blank notes page. | not read | Open the page → |
S Daikin RTU 2 p79 Copy of S_Daikin RTU-2_pdf.pdf · page 79 | Daikin brochure - Notes (p.79) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 79): Blank notes page. | not read | Open the page → |
S Daikin RTU 2 p8 Copy of S_Daikin RTU-2_pdf.pdf · page 8 | Daikin brochure - Applications & Serviceability (p.8) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 8): Application and service notes; no electrical. | not read | Open the page → |
S Daikin RTU 2 p80 Copy of S_Daikin RTU-2_pdf.pdf · page 80 | Daikin brochure - Notes (p.80) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 80): Blank notes page with back-cover copyright. | not read | Open the page → |
rocklinelectric.net Mail CM CORP p1 rocklinelectric.net Mail - CM CORP_ The Melt- Stanford, CA- Answered RFI_s.pdf · page 1 | CM Corp email - The Melt Stanford, Answered RFIs (p.1) | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (007-rocklinelectric.net Mail - CM CORP_ The Melt- Stanford, CA- Answered RFI_s.pdf, page 1): Email memo transmitting RFI responses (attachment link only), bid due 3/17/2025; no RFI content on page. | not read | Open the page → |
A1.1 Copy of Drawings.pdf · page 11 | Circulation Plan | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 11): Circulation/furniture layout only; no tags, power or devices. | not read | Open the page → |
A6.0 Copy of Drawings.pdf · page 17 | Finish Plan and Schedule | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 17): Floor/wall/ceiling finish plan and schedule only. | not read | Open the page → |
A8.0 Copy of Drawings.pdf · page 20 | Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 20): Finish details (cooler wall, wainscot, tile corner, entrance mat, cove base, baby changer, threshold) - checked zoomed, no devices or supports. | not read | Open the page → |
DHH036 Copy of S_Daikin RTU-2_pdf.pdf · page 15 | Daikin DHH3 Expanded Cooling Data - DHH036 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 15): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
DHH048 Copy of S_Daikin RTU-2_pdf.pdf · page 19 | Daikin DHH3 Expanded Cooling Data - DHH048 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 19): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
DHH060 Copy of S_Daikin RTU-2_pdf.pdf · page 23 | Daikin DHH3 Expanded Cooling Data - DHH060 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 23): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
DHH072 Copy of S_Daikin RTU-2_pdf.pdf · page 27 | Daikin DHH3 Expanded Cooling Data - DHH072 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (006-Copy of S_Daikin RTU-2_pdf.pdf, page 27): Manufacturer cooling performance table (capacity/pressures/amps vs. temperature); mechanical data, no EC work. | not read | Open the page → |
G0.4 Copy of Drawings.pdf · page 5 | Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 5): Arch specs Div 00-06; TOC says Div 26 'see electrical drawings'. | not read | Open the page → |
G0.5 Copy of Drawings.pdf · page 6 | Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 6): Arch specs Div 06-08 (plastics, thermal/moisture, openings). | not read | Open the page → |
G0.6 Copy of Drawings.pdf · page 7 | Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 7): Arch specs Div 09-10 (finishes, specialties). | not read | Open the page → |
G0.7 Copy of Drawings.pdf · page 8 | Green Building Standards Checklist | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 8): CALGreen checklist (water, materials, HVAC filters); no electrical items. | not read | Open the page → |
M2.0 Copy of Drawings.pdf · page 27 | Mechanical Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 27): Roof curb, RTU mounting, diffuser and duct hanger details - no electrical. | not read | Open the page → |
M4.0 Copy of Drawings.pdf · page 29 | Mechanical Title 24 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 29): Title 24 mechanical compliance forms. | not read | Open the page → |
M4.1 Copy of Drawings.pdf · page 30 | Mechanical Title 24 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 30): Title 24 mechanical compliance forms and mandatory measures. | not read | Open the page → |
M5.4 Copy of Drawings.pdf · page 35 | Captive Aire | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 35): Grease duct side/top views, DW-2R duct spec, riser cover and clearance details only. | not read | Open the page → |
P1.0 Copy of Drawings.pdf · page 46 | Plumbing Schedules and Legends | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 46): Plumbing legend, fixture/backflow/food service schedules; only electrical data is 120V for GWH-1,2 water heaters (power belongs on E sheets). | not read | Open the page → |
P2.0 Copy of Drawings.pdf · page 47 | Plumbing Sanitary | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 47): Sanitary waste and vent plan, grease waste calcs. | not read | Open the page → |
P3.0 Copy of Drawings.pdf · page 48 | Plumbing Domestic Water | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 48): Domestic water/gas plan; keynotes mention Captive Aire gas shut-off solenoid and routing around transformer, but no EC work shown. | not read | Open the page → |
P4.0 Copy of Drawings.pdf · page 49 | Plumbing Risers | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 49): Domestic water and sanitary riser isometrics. | not read | Open the page → |
P4.1 Copy of Drawings.pdf · page 50 | Plumbing Risers | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 50): Gas riser and gas demand calc. | not read | Open the page → |
P5.0 Copy of Drawings.pdf · page 51 | Plumbing Details | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 51): Plumbing details (drains, trap primer, water heater, pipe hangers/unistrut for piping); heat cable 'by others' note only. | not read | Open the page → |
P6.0 Copy of Drawings.pdf · page 52 | Plumbing Specifications | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 52): Division 22 plumbing specification text. | not read | Open the page → |
P7.0 Copy of Drawings.pdf · page 53 | Plumbing Title 24 | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 53): Title 24 domestic water heating compliance forms. | not read | Open the page → |
T1.0 Copy of Drawings.pdf · page 1 | Title Sheet | Looked at by the takeoff and not read: no electrical work on it. The sorter looked at the page (003-Copy of Drawings.pdf, page 1): Cover: notes, abbreviations, sheet index, scope list (new lighting, electrical, FA deferred); no drawn electrical work. | not read | Open the page → |