Answer the questions on the drawings first
11 lines of this takeoff have a count but no settled RRE Components item — 9 questions, each asked on the drawing it was counted off (ringed yellow with a “$”), with the recommended pick, a search, and “not in this bid”. 7 suggested lines RRE carries on jobs like this (supports, safe-off, terminations, disconnects, Tenmat) are asked on the drawing they come from: add with a count, or “not in this bid”. The Draft Estimate opens when every one is answered, so it only ever works from priced materials.
004-Copy-of-S_CaptvieAire-208V_pdf-p3 — 3 questions · 004-Copy-of-S_CaptvieAire-208V_pdf-p11 — 2 questions · E2.0 — 7 questions · E3.0 — 1 question · E3.1 — 1 question · E3.2 — 1 question · E4.0 — 3 questions · M1.0 — 2 questions
Start with 004-Copy-of-S_CaptvieAire-208V_pdf-p3 →