Checks to see if all required documentation is uploaded and received by RRE.
Per the RRE Bid Intake Guideline →. Only missing panel schedules block. Hover a row for the detail.
| Check | Status | Found | Next step |
|---|---|---|---|
| Job facts stated | warning | 2 blank: project address, construction type. | Type them on Step 1. |
| Electrical drawings | warning | 185 sheets · 1 scanned (reads worse). | Ask the GC for a vector set if one exists. |
| Panel schedules | pass | On 004-Copy-of-S_CaptvieAire-208V_pdf-p3, A2.1-003-Copy-of-Drawings-p14, E1.1, E4.0, E5.0, E5.1, M5.1, UL-103. | |
| Single-line / riser | not included | Not included in the set. | Ask for the one-line if the job touches service, feeders or gear. |
| Lighting information | pass | 25 fixture lines. | |
| Equipment schedules | pass | 58 equipment connections. | |
| Specifications | pass | On a drawing sheet. | |
| Utility / civil | not checked | No site sheet — fine if interior only. | Confirm whether the job includes site or utility scope. |
| Existing conditions | not checked | No demolition read; construction type not set. | Set the construction type on Step 1. |
| Addenda / revisions | not checked | Base set only. | Check the bid portal for the latest revision before submitting. |
| Architectural drawings | pass | 12 A sheets read for electrical scope: A1.0, A2.0, A2.1, A2.1-003-Copy-of-Drawings-p14, A3.0, A4.0…. | |
| Responsibility matrix / GC scope | pass | On G0.3, Copy of Drawings p.4. |