What the takeoff said: Read from 000-Copy of Drawings.pdf, page 15 (text outlined; read from renders at 60-250 dpi). Architectural floor plan of the 'FUTURE RETAIL' shell (M occupancy, type VB). Electrical items drawn are callouts only, each deferring to the E set: 'ELEC. MAIN SWITCHBOARD CABINET, SEE ELEC. DWGS.' (outside the north wall at the property line, Willow St side), 'TELEPHONE PANEL, SEE ELEC. DWGS.' and 'ELEC. & LIGHTING CONTROL PANELS, SEE ELEC. DWGS.' (west wall just north of the fire riser room, 3 filled rectangles), 'KNOX BOX, MOUNTED PER FIRE DEPT. REQUIREMENTS' (NE entrance), and an 'EV CHARGING ONLY' stall west of the building. MSB, panel H, LCP, tel/data backboard and EV-1..EV-3 are taken off from E1.1/E3.0/E5.0, so no lines are written here. No responsibility matrix, no equipment schedule, no LV/AV/security positions, no strut/support or display details, no demolition, no temporary-power note on this sheet.