What the takeoff said: Read from 000-Copy of Drawings.pdf, page 18. No text layer (vector outlines); read from renders at 60-130 dpi. No responsibility matrix, no equipment schedule, no LV plan, no strut/support details. No light fixture, wall light, sconce, receptacle, J-box or address-number symbol is drawn on either elevation (the soffit/wall lights B/C/D are counted on E4.0/E2.2, not here). Electrical references on the sheet: East elev. leader 'LINE OF ELEC. MAIN SWITCHBOARD CABINET, SEE ELEC. DWGS.' (MSB taken off on E1.1/E5.0); NOTE box 'WALL SIGNS ARE BY SEPARATE PERMIT'; GENERAL NOTE 1 building number 'INTERNALLY OR EXTERNALLY ILLUMINATED'. Nothing on this sheet carries a count or measurement for the EC, so no lines and no marks file.