What the takeoff said: Read from 000-Copy of Drawings.pdf, page 45 (text outlined; read from a 100-dpi render). Roof plan shows two new packaged rooftop units, AC-1 (west) and AC-2 (east), each tagged key note 1 'NEW PACKAGED ROOFTOP UNIT. SEE M0.2 FOR EQUIPMENT SPECIFICATION.' General notes A-D are coordination/field-verify, thermostat location approval (C) and air balancing (D, mechanical). No electrical data, no equipment schedule, no disconnects, receptacles, conduit, strut/sleepers, responsibility matrix, demolition or temporary-power note on this sheet. The units' power (60A fused NEMA 3R disconnects, 1"C (3)#4 & #10G feeders, LFMC whips, equipment connections, roof GFCI WP receptacles, RGS roof conduit) is drawn and taken off on E3.0, so no lines are written here and no marks file is written (nothing counted off this sheet).