Loading…
What the takeoff said: Read from 000-Copy of Drawings.pdf, page 10 (raster/outlined; read visually). No text layer. No responsibility matrix, no equipment schedule, no strut/support detail, no demolition on this sheet. No lines written: the only electrical items drawn (EV chargers) are counted on E1.1 (EV-1..EV-3, disconnects, connections, feeders), so nothing is re-taken here.