Loading…
What was received, analyzed.
1 of 6 were stated in the documents and read off them. 1 are blank because no document says — type them here and they carry into Step 2, the readiness gate and the proposal. Last set by kelchlin on 9/29/2026, 11:49:47 PM.
| Drawing or construction set | found | 50 pages · 62 electrical sheet(s). |
| Symbol list on the drawings | partial | No legend found — symbols named from NECA 100-2006. |
| Bid invitation or RFP | found | Received. |
| File | Type | Pages | Received | |
|---|---|---|---|---|
| Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf | Drawing set | 50 | 9/29/2026 | Open → |
| rocklinelectric.net Mail - Fwd_ INVITATION TO BID - Intimissimi - Roseville CA.pdf | Bid invitation | 3 | 9/29/2026 | Open → |
Every page was sorted when the set was uploaded: 7 electrical, 11 from other trades with electrical scope, and 35 not electrical. Only the electrical pieces are read; each skipped page is listed below with the reason.
| Sheet | Why |
|---|---|
E1.0 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 39 | electrical sheet |
E2.0 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 40 | electrical sheet |
E3.0 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 41 | electrical sheet |
E4.0 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 42 | electrical sheet |
E4.1 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 43 | electrical sheet |
E5.0 — DRAWN BY: AEB CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 44 | electrical sheet |
E6.0 — DRAWN BY: AEB CL REVIEWED BY: |
| Engineering firm | Not included |
| Sheets read | 62 read · 9 with marks on the drawing rocklinelectric.net Mail Fwd INVITATION p1, rocklinelectric.net Mail Fwd INVITATION p2, rocklinelectric.net Mail Fwd INVITATION p3, A000, A001, A002, A002.1, A002.2, A002.3, A003, A101, A102, A102, A103, A104, A105, A201, A202, A203, A204, A211, A212, A213, A301, A302, A303, A304, A401, A402, AS01, AS02, D101, D102, D102, D103, D104, D105, D106, E1.0, E1.0, E2.0, E2.0, E3.0, E3.0, E4.0, E4.0, E4.1, E4.1, E5.0, E5.0, E6.0, E6.0, M1.0, M2.0, M3.0, M4.0, M5.0, S101, S201, S301, ST0, ST1 |
electrical sheet |
| Sheet | Why |
|---|---|
AS01 — SPECIFICATIONS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 2 | furnished-by / installed-by (7×) · power / boxes (1×) · low-voltage cabling / pathways (1×) |
A001 — SCHEDULES & DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 4 responsibility matrix | responsibility / division-of-work matrix · furnished-by / installed-by (70×) · power / boxes (1×) |
D102 — DEMOLITION RCP Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 11 | title: reflected ceiling plan · furnished-by / installed-by (1×) · low-voltage cabling / pathways (2×) |
A101 — CONSTRUCTION FLOOR PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 16 | furnished-by / installed-by (7×) · low-voltage cabling / pathways (3×) · receptacles / floor boxes (2×) |
A102 — CONSTRUCTION RCP Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 17 | title: reflected ceiling plan · work assigned to the EC / Div 26-28 (1×) · furnished-by / installed-by (5×) |
A213 — CONSTRUCTION DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 27 | furnished-by / installed-by (17×) · power / boxes (2×) |
A301 — STOREFRONT ELEVATION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 28 | title: millwork / fixtures / storefront · furnished-by / installed-by (2×) · power / boxes (1×) |
A302 — STOREFRONT DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 29 | title: millwork / fixtures / storefront · furnished-by / installed-by (4×) · fire alarm devices (1×) |
A303 — STOREFRONT DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 30 | title: millwork / fixtures / storefront · furnished-by / installed-by (7×) · fire alarm devices (1×) |
A402 — PARTITION TYPES Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 33 | furnished-by / installed-by (27×) · unistrut / rod / cable supports (1×) · light fixtures (7×) |
M4.0 — DRAWN BY: RM CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 37 | furnished-by / installed-by (3×) · low-voltage cabling / pathways (3×) · receptacles / floor boxes (1×) |
| Sheet | Why |
|---|---|
A000 — COVER SHEET Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 1 | only a passing mention of electrical work (fire alarm devices (1×) · receptacles / floor boxes (1×)) |
AS02 — SPECIFICATIONS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 3 | only a passing mention of electrical work (furnished-by / installed-by (1×) · low-voltage cabling / pathways (1×)) |
A002 — ACCESSIBILITY DIAGRAMS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 5 | nothing electrical in its title or notes |
A002.1 — ACCESSIBILITY DIAGRAMS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 6 | nothing electrical in its title or notes |
A002.2 — MALL MAP Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 7 | nothing electrical in its title or notes |
A002.3 — SITE PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 8 | nothing electrical in its title or notes |
A003 — EGRESS PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 9 | nothing electrical in its title or notes |
D101 — DEMOLITION FLOOR PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 10 | nothing electrical in its title or notes |
D103 — DEMOLITION CROSS SECTION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 12 | nothing electrical in its title or notes |
D104 — DEMOLITION CROSS SECTION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 13 | nothing electrical in its title or notes |
D105 — DEMOLITION CROSS SECTION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 14 | nothing electrical in its title or notes |
D106 — DEMOLITION STOREFRONT ELEVATION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 15 | only a passing mention of electrical work (title: millwork / fixtures / storefront · furnished-by / installed-by (1×)) |
A103 — FLOOR FINISH PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 18 | only a passing mention of electrical work (furnished-by / installed-by (33×)) |
A104 — WALL FINISH PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 19 | only a passing mention of electrical work (furnished-by / installed-by (12×)) |
A105 — FIXTURE PLAN Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 20 | only a passing mention of electrical work (title: millwork / fixtures / storefront · furnished-by / installed-by (16×)) |
A201 — CROSS SECTION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 21 | only a passing mention of electrical work (furnished-by / installed-by (22×) · equipment connections / signage power (1×)) |
A202 — CROSS SECTION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 22 | only a passing mention of electrical work (furnished-by / installed-by (14×)) |
A203 — ADA FITTING ROOM ELEVATION Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 23 | nothing electrical in its title or notes |
A204 — VESTIBULE Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 24 | nothing electrical in its title or notes |
A211 — CONSTRUCTION DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 25 | only a passing mention of electrical work (furnished-by / installed-by (12×)) |
A212 — CONSTRUCTION DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 26 | only a passing mention of electrical work (furnished-by / installed-by (19×)) |
A304 — STOREFRONT DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 31 | only a passing mention of electrical work (title: millwork / fixtures / storefront · furnished-by / installed-by (11×)) |
A401 — FRAMING & MISC. DETAILS Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 32 | only a passing mention of electrical work (unistrut / rod / cable supports (1×) · light fixtures (13×)) |
M1.0 — DRAWN BY: RM CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 34 | only a passing mention of electrical work (fire alarm devices (2×) · equipment connections / signage power (3×)) |
M2.0 — DRAWN BY: RM CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 35 | nothing electrical in its title or notes |
M3.0 — DRAWN BY: RM CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 36 | nothing electrical in its title or notes |
M5.0 — DRAWN BY: RM CL REVIEWED BY: Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 38 | nothing electrical in its title or notes |
S101 — DRAWN BY: FD REVIEWED BY: EC Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 46 | nothing electrical in its title or notes |
S201 — DRAWN BY: FD REVIEWED BY: EC Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 47 | nothing electrical in its title or notes |
S301 — DRAWN BY: FD REVIEWED BY: EC Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 48 | nothing electrical in its title or notes |
ST0 — DRAWN BY: FD REVIEWED BY: EC Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 49 | nothing electrical in its title or notes |
ST1 — DRAWN BY: FD REVIEWED BY: EC Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · page 50 | only a passing mention of electrical work (unistrut / rod / cable supports (1×) · light fixtures (3×)) |
no sheet number rocklinelectric.net Mail - Fwd_ INVITATION TO BID - Intimissimi - Roseville CA.pdf · page 1 | nothing electrical in its title or notes |
no sheet number rocklinelectric.net Mail - Fwd_ INVITATION TO BID - Intimissimi - Roseville CA.pdf · page 2 | nothing electrical in its title or notes |
no sheet number rocklinelectric.net Mail - Fwd_ INVITATION TO BID - Intimissimi - Roseville CA.pdf · page 3 | nothing electrical in its title or notes |