Loading…
What the takeoff said: Read from 000-Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf, page 21. Two building sections A and B at 3/8"=1'. No responsibility matrix, no equipment schedule, no demolition, no low-voltage positions. Every electrical item drawn is already counted on the E sheets, so no line is taken off here and no marks file is written.