FRAMING & MISC. DETAILS
Page 32 of Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf · read for electrical scope only; nothing marked on it← Work queueWhat the takeoff said: Read page 32 (text layer + render). Details: 1 Light Fixture Support Detail (CBC Figs 6.4.9.1-7 / 6.4.9.1-8, recessed fixture in suspended ceiling); 2 Seismic Gyp. Clg. Suspension; 3 Metal Stud Framing; 6 ACT Ceiling Detail with sub-details A Hanger Wire Tie, B Bracing Wire Tie, C Ceiling Perimeter, D Light Fixture Attachment, and Compression Strut Schedule; 5 USG Gyp. Clg. Suspension; 6 Partition Framing Details and Notes. No responsibility matrix, no equipment schedule, no LV plan, no demolition.
What the takeoff took off this page (2 lines)
- L-0106 #12 GA SEISMIC SAFETY WIRE, RECESSED FIXTURE TO STRUCTURE, 3 TURNS IN 1-1/2" EACH END, W/ 3/8" EXPANSION ANCHOR OR TIE-OFF AT STRUCTURE (1 per fixture < 10 lb, gyp ceiling) — 15 ea
- L-0107 #12 GA SUPPLEMENTAL HANGER WIRE AT EACH CORNER OF 2x2 LAY-IN FIXTURE, ACT GRID TO STRUCTURE, 3 TIGHT TURNS IN 3" (fixture <= 20 lb) — 12 ea