Loading…
What the takeoff said: Read from 000-Copy of 2024.11.28_INT_US_CA_Roseville_Galleria at Roseville_LL PERMIT BID SET_FULL.pdf, page 50 (ANF & Associates, structural). Details 2, 4-10, 12, 14: interior metal stud schedule, header/jamb, ceiling joist connections, dropped-ceiling unistrut framing, suspended T-bar seismic ceiling (12), hanger/bracing wire ties (14). No responsibility matrix, no equipment schedule, no demolition, no LV devices on this sheet.