Who furnishes (F) and installs (I) each part of the electrical scope, what is not applicable (N/A), by others (BO), or existing (E). Each letter says where it came from: a person, an RFI answer, RRE’s standard (the same on every past proposal), or this job’s takeoff. Rows nobody can fill are asked of the GC from here or from RFIs. The proposal prints these letters.
0 set by a person · 0 from RFI answers · 105 RRE standard · 47 from the takeoff
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| LIGHT FIXTURES | From the takeoff a guess: check it | No fixture line says owner-furnished, so RRE supplies them (21 takeoff lines, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT). RRE supplied fixtures on 2 of 5 past jobs: check the fixture schedule. | ||
| LAMPS | From the takeoff a guess: check it | No fixture line says owner-furnished, so RRE supplies them (21 takeoff lines, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT). RRE supplied fixtures on 2 of 5 past jobs: check the fixture schedule. | ||
| EXIT LTG’S | From the takeoff a guess: check it | No fixture line says owner-furnished, so RRE supplies them (21 takeoff lines, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT). RRE supplied fixtures on 2 of 5 past jobs: check the fixture schedule. | ||
| EMERGENCY LTG’S | From the takeoff a guess: check it | No fixture line says owner-furnished, so RRE supplies them (21 takeoff lines, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT). RRE supplied fixtures on 2 of 5 past jobs: check the fixture schedule. | ||
| BATTERY BACKUP / EM DRIVERS | From the takeoff a guess: check it | 1 takeoff line, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT. | ||
| LTG INVERTERS | From the takeoff a guess: check it | 2 takeoff lines, e.g. EMERGENCY LIGHTING INVERTER BODINE ELI-S-20, 20VA 120V, 90-MIN NICD, CEILING MOUNT. | ||
| TIME CLOCK | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 4 of 5 past jobs: check the drawings. | ||
| LTG CONTACTORS | From the takeoff a guess: check it | 3 takeoff lines, e.g. LIGHTING CONTACTOR ELECTRICALLY HELD, SQUARE D 8903, 12-POLE, IN ENCLOSURE (LC1). | ||
| OVERRIDE SWITCH | From the takeoff a guess: check it | 2 takeoff lines, e.g. SWITCH, 2-HOUR TIMED OVERRIDE. | ||
| LTG CONTROL PANEL (LCP) | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 2 of 5 past jobs: check the drawings. | ||
| POWER PACK / DIMMING RELAY | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 2 of 5 past jobs: check the drawings. |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| TRENCH & BACKFILL PARKING POLE LTG MAX 2FT DEPTH | Nobody knows | This job's takeoff shows 1 takeoff line, e.g. 1" PVC SCH 40 CONDUIT IN SLAB TRENCH w/ PULL STRING (KN3: 2 power + 1 data), though RRE marked N/A on all 5 past proposals: left blank to check. |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| FLOOR BOXES / POWER POLES | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 2 of 5 past jobs: check the drawings. | ||
| SEAL CONDUITS IN FREEZER AREA | Nobody knows | This job's takeoff shows 1 takeoff line, e.g. JUNCTION BOX 4" SQ, CEILING, HARD-WIRED EQUIPMENT CONNECTION (INVERTERS, TIME SWITCH, CONTACTORS, WALK-IN LIGHTS), though RRE marked N/A on all 5 past proposals: left blank to check. | ||
| POWER FOR HAND DRYER | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 2 of 5 past jobs: check the drawings. |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| 120V POWER TO ELECTRIC WATER HEATER | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 3 of 5 past jobs: check the drawings. | ||
| DISCONNECT SWITCH FOR WATER HEATER & EQUIPMENT CONNECTION | From the takeoff a guess: check it | Not on the takeoff, but RRE carried it on 3 of 5 past jobs: check the drawings. |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| BUILDING INTERIOR TRANSFORMER | Nobody knows | No transformer on the takeoff, so it is left blank: check the single line. (Existing on 3 of 5 past jobs.) | ||
| TRANSFORMER BRACKETS - FOR HANGING ETC | Nobody knows | No transformer on the takeoff, so it is left blank: check the single line. (Existing on 3 of 5 past jobs.) |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| HVAC CONTROL WIRING | Nobody knows | This job's takeoff shows 4 takeoff lines, e.g. ROOM OVERRIDE THERMOSTAT (HOOD ROOM TEMPERATURE SENSOR) BACKBOX, SINGLE-GANG WALL J-BOX AT 5'-6" AFF + 3/4" EMT STUB TO ACCESSIBLE CEILING, though RRE marked N/A on all 5 past proposals: left blank to check. |
| Item | Letter | Source | Why | |
|---|---|---|---|---|
| OFF-HAULING EXCESS SOIL | Nobody knows | This job's takeoff shows 1 takeoff line, e.g. 1" PVC SCH 40 CONDUIT IN SLAB TRENCH w/ PULL STRING (KN3: 2 power + 1 data), though RRE marked N/A on all 5 past proposals: left blank to check. | ||
| COMPACT ELECTRICAL TRENCHES | Nobody knows | This job's takeoff shows 1 takeoff line, e.g. 1" PVC SCH 40 CONDUIT IN SLAB TRENCH w/ PULL STRING (KN3: 2 power + 1 data), though RRE marked N/A on all 5 past proposals: left blank to check. |