Loading…
What the takeoff said: Read from 006-Copy of S_Daikin RTU-2_pdf.pdf, page 63. Manufacturer factory wiring diagram in the RTU-2 submittal, not a construction plan: no plan positions, no schedule with MCA/MOCP, nothing drawn to measure. Field connections shown are the line-voltage supply to the power distribution block PB (L1, L2, GND, '208-230V/1PH/60Hz'), thermostat field wiring to TB1 (Class 2), and factory plug-in options (SMK smoke detector, ES emergency shutdown, RDS refrigerant detection, ECON). The RTU-2 disconnect, circuit and equipment connection are already taken off E3.1, so no lines are written here.