What the takeoff said: Read from 006-Copy of S_Daikin RTU-2_pdf.pdf, page 64 (text layer read in full). This is the manufacturer's factory wiring diagram in the RTU-2 submittal, not a construction plan. It has no plan positions, no MCA/MOCP schedule and nothing drawn to scale. The field connections it shows are the line-voltage supply '208-230V/3PH/60Hz' to power distribution block PB (L1, L2, L3, GND), thermostat field wiring to TB1 (R, C, G, Y1, Y2, W1, W2, O, 'USE N.E.C. CLASS 2 WIRE FOR ALL LOW VOLTAGE FIELD CONNECTIONS'), and factory plug-in options (SMK smoke detector, ES emergency shutdown, RDS refrigerant detection, ECON). The triage hits (boxes, fire alarm, equipment connection) come from these legend entries, not from drawn devices. The RTU-2 disconnect, circuit and equipment connection are taken off E3.1/E4.0, so this page adds no lines and no equipment file (it carries no MCA/MOCP).