What the takeoff said: Read from 006-Copy of S_Daikin RTU-2_pdf.pdf, page 66 (text layer read in full: 5,304 chars, vector). This is the manufacturer's factory wiring diagram in the RTU-2 submittal (SS-DHH3-R32), not a construction plan. It has no plan positions, no MCA/MOCP data and nothing drawn to scale. The only field connections it shows are the line-voltage supply '208-230/460/575V/3PH/60Hz' to power distribution block PB (L1, L2, L3, GND) and thermostat field wiring to TB1 ('USE N.E.C. CLASS 2 WIRE FOR ALL LOW VOLTAGE FIELD CONNECTIONS'). Factory plug-in options are SMK smoke detector, ES emergency shutdown, RDS refrigerant detection and ECON. The triage hits (boxes, fire alarm, equipment connection) come from these legend entries, not from drawn devices. The RTU-2 disconnect, circuit and equipment connection are taken off E3.1/E4.0, so this page adds no lines, no equipment file and no marks.