Loading…
What the takeoff said: Read from 007-rocklinelectric.net Mail - CM CORP_ The Melt- Stanford, CA- Answered RFI_s.pdf, page 2 (rendered at 110 dpi; embedded text is not decodable). Email page, not a drawing: bid date March 17, 2025 03:00 pm; Location 180 El Camino Real, Ste. 705 Palo Alto CA 94304; Trade(s) 16050 - Electrical; Estimator Steve Foster; scope 'a remodel of an existing 3,205sf of The Melt restaurant. Scope includes, but is not limited to, interior partitions, equipment/millwork, ceilings, storefront and door modifications, relocated site light poles and misc. plumbing and electrical work.' No drawn items, no schedule, no responsibility matrix, no support details: nothing to count, so no lines and no marks file.