What the takeoff said: Read from drawings/003-Copy of Drawings.pdf page 13 (raster only, no text layer; read from 200-220 dpi crops). One table: EQUIPMENT SCHEDULE (item, qty, description, size, manufacturer, model, ELECTRICAL elec/phase/plug/amp/volts/watts/HP, plumbing, gas, remarks). No plan, no detail, no responsibility matrix, no demolition, no temp-power note, no strut/rod/support detail. Every unit carrying electrical data is already connected on E3.0/E3.2/E4.0 (E3.0 L-0002 GFCI duplex list, L-0004 special-purpose 208V at C-720/730/780x2/800/830/870/900, L-0007 J-boxes incl. hand dryers A-43/A-45; E3.2 POS/kiosk receptacles and LV backboxes), so no line is re-taken here and no marks file is written. Electrical data written to output/work/equipment/A2.1.json.