What the takeoff said: Read from 003-Copy of Drawings.pdf, page 16 (vector text + 40/110/200-dpi renders). Unisex restrooms 104/105 enlarged plan, four interior elevations, general notes 1-8 (dimensions, datum, site survey, fire sprinkler deferred submittal, backing/blocking, hazmat, work hours), keynote 9.02 (tile grout), and the RESTROOM ACCESORIES schedule. The only powered item is B-245 HAND DRYER, QTY 2, EXCEL XCELERATOR XL-GR, drawn on the lavatory-wall elevation beside mirror B-250. Both dryers are already taken off on E3.0 (L-0007 J-boxes, circuits A-43 and A-45), so no line is written here. No strut, rod or support details; no LV/security/AV devices; no responsibility matrix; no demolition; no note assigns work to the EC or to Division 26-28. No marks file and no equipment file: nothing is counted off this sheet, and the schedule prints no volts/amps for B-245 (A2.1 equipment file already carries B-245).