Loading…
What the takeoff said: Read from 003-Copy of Drawings.pdf, page 26 (vector sheet, text layer holds title block only; plan read from a 90-dpi render). No lines written: the sheet has no electrical notes, no schedule, no responsibility matrix, and every powered unit it locates is already taken off E3.1.