CAPTIVE AIRE - reprint of CaptiveAire master drawing 6912904 sheets 13-16: DCV hood control panel specifications, sequence of operations, typical hood control panel installation, HMI detail, duct thermistor sensor installation, room override thermostat, SDV, Title 24 badge; ductwork #1 (double wall) and #2 (single wall) parts lists, support spacing, side/top/SE/front views
Page 34 of Copy of Drawings.pdf · read for electrical scope only; nothing marked on it← Work queueNext in queue: 004-Copy-of-S_CaptvieAire-208V_pdf-p3 →What the takeoff said: 003-Copy of Drawings.pdf page 34, raster (no text layer beyond title block); read from renders at 220-400 dpi. No lines written: every EC item on this sheet is already taken off from the identical CaptiveAire sheet 13 (004-Copy-of-S_CaptvieAire-208V_pdf-p13 L-0001..L-0003); re-taking it here would double count.
The takeoff found no electrical work on this page